Tanjung Kidurong power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Tanjung Kidurong power station is an operating power station of at least 1159-megawatts (MW) in Tanjung Kidurong, Sarawak, Malaysia. It is also known as Bintulu.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Tanjung Kidurong power station | Tanjung Kidurong, Sarawak, Malaysia | 3.2899, 113.0942 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- CC1, CC2, CC3: 3.2899, 113.0942
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
CC1 | Operating[2] | fossil gas: natural gas[2] | 317[2] | combined cycle[3][4] | not found | 2010[3] |
CC2 | Operating[5][6][7][8][9] | fossil gas: natural gas[4] | 421[4] | combined cycle[4] | not found | 2022[9][10] |
CC3 | Operating[5][6][7][8][9] | fossil gas: natural gas[4] | 421[4] | combined cycle[4] | not found | 2022[9][10] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
CC1 | Sarawak Energy Bhd [100%][2][11] | Sarawak Energy Bhd [100.0%] |
CC2 | Sarawak Energy Bhd [100%][2][11] | Sarawak Energy Bhd [100.0%] |
CC3 | Sarawak Energy Bhd [100%][2][11] | Sarawak Energy Bhd [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Sarawak Energy disclosed that the expansion of the power station involving units CC2 and CC3 had required investment of RM3.1 billion (US$750 million as of May 2025 exchange rate).[12]
Articles and Resources
References
- ↑ https://web.archive.org/web/20240125091319/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20230202030633/https://www.sarawakenergy.com/what-we-do/power-generation. Archived from the original on 2023-02-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20210312193202/https://cdm.unfccc.int/filestorage/h/v/1E4FYDVNQUPIZSGA2W593KRCB0MTX6.pdf/CDM-PDD_version_3_3%28CLN%29.pdf?t=Z0l8cXB2Zml4fDBLJeDzardbre37AH1ZClSy. Archived from the original (PDF) on 2021-03-12.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 (PDF) https://web.archive.org/web/20220707174733/https://www.st.gov.my/contents/2020/Maps/Electricity%20%26%20Gas%20Supply%20Infrastucture%20Malaysia%202019.pdf. Archived from the original (PDF) on 2022-07-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20210311025931/http://www.xinhuanet.com/energy/2019-12/13/c_1125344617.htm. Archived from the original on 2021-03-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20221226150409/https://www.nsenergybusiness.com/projects/tanjung-kidurong-combined-cycle-power-project/. Archived from the original on 2022-12-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20211102105809/https://www.sarawakenergy.com/what-we-do/major-projects-1. Archived from the original on 2021-11-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20231024230901/https://dayakdaily.com/minister-visits-sarawak-energys-tanjung-kidurong-combined-cycle-power-plant-in-bintulu/. Archived from the original on 2023-10-24.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 https://web.archive.org/web/20221006065905/https://www.sarawakenergy.com/media-info/media-releases/2022/tanjung-kidurong-combined-cycle-power-plants-new-power-blocks-prepare-for-full-commissioning. Archived from the original on 2022-10-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 https://web.archive.org/web/20220709125615/https://www.ge.com/news/reports/engineering-a-record-setting-environment-for-success-at-tanjung-kidurong. Archived from the original on 2022-07-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 (PDF) https://web.archive.org/web/20220709132908/https://www.sarawakenergy.com/assets/pdf/Sarawak_Energy_Annual_Report_2018.pdf. Archived from the original (PDF) on 2022-07-09.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Tanjung Kidurong Combined Cycle Power Plant’s New Power Blocks Prepare For Full Commissioning, Sarawak Energy press release, Aug. 29, 2022
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.