Tardienta wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Tardienta wind farm is an operating wind farm in Los Monegros, Aragon, Spain.
Project Details
Table 1: Phase-level project details for Tardienta wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2001[2] | 50 MW[1] | Onshore[1] | Iberdrola Renovables Energia SA [100%][3] | Iberdrola Renovables Energia[1] |
2 | Operating[4] | 2001[2] | 44 MW[4] | Onshore[4] | Iberdrola Renovables Energia SA [100%][5] | Sistemas Energéticos Torralba[4] |
Location
Table 2: Phase-level location details for Tardienta wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Los Monegros, Aragon, Spain[6] | 41.9240, -0.5820 (exact)[6] |
2 | Los Monegros, Aragon, Spain[6] | 41.9110, -0.5610 (exact)[6] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20210927191041/https://www.aeeolica.org/sobre-la-eolica/la-eolica-espana/mapa-de-parques-eolicos/aragon/tardienta-i. Archived from the original on 27 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20240126170104/http://bases.cortesaragon.es/bases/ndocumen.nsf/e86600a24e054a61c12576d2002e551c/4d28dbf939b98015c1257689004294f7/$FILE/desarrollo_eolico_aragon.pdf. Archived from the original (PDF) on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131153928/https://gum.criteo.com/syncframe?origin=publishertag&topUrl=cadenaser.com&gdpr=0&gdpr_consent=. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20210927185111/https://www.aeeolica.org/sobre-la-eolica/la-eolica-espana/mapa-de-parques-eolicos/aragon/tardienta-ii. Archived from the original on 27 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20210927212659/https://www.iberdrola.com/wcorp/gc/prod/en_US/conocenos/docs/Annex_List_Companies_Rules.pdf. Archived from the original (PDF) on 27 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://web.archive.org/web/20240126041921/https://idearagon.aragon.es/datosdescarga/descarga.php?file=energia/renovable.zip. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help)