This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Tarrawonga Coal Mine is an operating coal mine in Boggabri, New South Wales, Australia.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Tarrawonga Coal Mine | Boggabri, New South Wales, Australia[1][2] | -30.639584, 150.167277 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating[1] | – | 2006[1] | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
2.7[3] | 1.95[4] | 2023[4] | Surface[1] | Open Pit[1] | 12.31[5] | 60.0* | 180[1] |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
23.0[6] | 2024[6] | 67.0 | Gunnedah[1] | Subbituminous | Thermal & Met[1] | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Tarrawonga Coal Pty Ltd [100%][1][7][8] | Whitehaven Coal Ltd [100.0%] | Australia |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM[4] | 1.87[9] | 2.75[10] | 2.26[10] | 2.51[11] | 2.19[11] | 2.42[4] | 1.95[4] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker May 2025 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Tarrawonga coal mine is a surface mine operated by Tarrawonga Coal Pty Ltd (TCPL), a subsidiary of Whitehaven Coal, in Boggabri, New South Wales, Australia.[12] Whitehaven Coal operates the mine.[12]
- Operator: Tarrawonga Coal Pty Ltd (TCPL)[13]
- Owner: Whitehaven Coal[12]
- Location: 16km north-east of Boggabri, New South Wales, Australia[14]
- GPS Coordinates: -30.639584, 150.167277 (exact)
- Status: Operating
- Capacity: 3 million short tons[12]
- Production: 2.2 million tonnes[15]
- Total Resource: 67 million tonnes (Measured, Indicated and Inferred Resource, 2020) [16]
- Mineable Reserves: 35 million tonnes (Proven and Probable Reserves, 2020) [16]
- Coal Type:
- Mine Size:
- Mine Type: Surface[12]
- Mining Method: Opencut[12]
- Start Year: 2006[14]
- Source of Financing:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://whitehavencoal.com.au/our-business/our-assets/tarrawonga-mine/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240121031856/https://whitehavencoal.com.au/Documentations/Tarrawonga%20Mine/Approvals/Environmental%20Assessments/TAR-PA11_0047%20MOD9-%20Environmental%20Assessment%20%28EA%29.pdf. Archived from the original (PDF) on 21 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://whitehavencoal.com.au/Documentations/Tarrawonga%20Mine/Environmental%20Management;%20Monitoring%20&%20Compliance/Annual%20Reviews/TAR%20-%20Annual%20Review%202022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 (PDF) https://whitehavencoal.com.au/Documentations/Tarrawonga%20Mine/Environmental%20Management;%20Monitoring%20&%20Compliance/Annual%20Reviews/TAR%20-%20Annual%20Review%202023.pdf?v=1719540100.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://minedocs.com/23/Tarrawonga-Rehabilitation-Management-Plan-082022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://whitehavencoal.com.au/wp-content/uploads/2024/11/Whitehaven-Coal-Limited-Resources-Reserves-August-2024.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://whitehavencoal.com.au/Documentations/Tarrawonga%20Mine/Approvals/Authorisations%20under%20the%20EP%20and%20A%20Act/TAR%20-%20Project%20Approval%20(PA)%2011_0047%20MOD%209%20Consolidate.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240722224356/https://whitehavencoal.com.au/Documentations/Tarrawonga%2520Mine/Approvals/Environment%2520Protection%2520Licence/Tar%2520-%2520EPL%252012365%2520Variation%2520-%2520June%25202023.pdf. Archived from the original (PDF) on 22 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://whitehavencoal.com.au/Documentations/Tarrawonga%20Mine/Environmental%20Management;%20Monitoring%20&%20Compliance/Annual%20Reviews/TAR-%20Annual%20Review%202018.pdf?v=1695726595.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 (PDF) https://whitehavencoal.com.au/Documentations/Tarrawonga%20Mine/Environmental%20Management;%20Monitoring%20&%20Compliance/Annual%20Reviews/TAR%20-%20Annual%20Review%202019.pdf?v=1695726595.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 (PDF) https://whitehavencoal.com.au/Documentations/Tarrawonga%20Mine/Environmental%20Management;%20Monitoring%20&%20Compliance/Annual%20Reviews/TAR%20-%20Annual%20Review%202021.pdf?v=1695726595.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 12.3 12.4 12.5 Whitehaven Coal, 2019 Full Year Results, company website, accessed June 16, 2020
- ↑ Tarrawonga Coal Mine - Waste Tyre Disposal Modification Report, Whitehaven Coal website, February 2021.
- ↑ 14.0 14.1 Cite error: Invalid
<ref>
tag; no text was provided for refs namedWHO
- ↑ Tarrawonga, Mining Data Online, accessed 2022
- ↑ 16.0 16.1 Whitehaven Coal, "Whitehaven Coal Annual Report 2020", Accessed May 2021