Tavazzano power station (TAVAZZANO E MONTANASO) is an operating power station of at least 1150-megawatts (MW) in Tavazzano, Lodi, Italy with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Tavazzano power station Tavazzano, Lodi, Italy 45.3325, 9.4364 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 5, Unit 6, Unit CCGT8, Unit CCST8, Unit GT8: 45.3325, 9.4364

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 5 operating[2][3] fossil gas - natural gas[2] 765[2] combined cycle[2] 2005[2]
Unit 6 operating[2] fossil gas - natural gas[2] 385[2] combined cycle[2] 2005[2]
Unit CCGT8 construction[4][5] fossil gas - natural gas[6] 560[6] gas turbine[7] 2024[8][6]
Unit CCST8 construction[5] fossil gas - waste heat from natural gas, bioenergy - unknown[6] 290[6] steam turbine[7] 2024[8][6]
Unit GT8 retired[2] fossil gas - natural gas[2] 320[2] gas turbine[2] 1992[2] 2020[2]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 5 EP Produzione SpA [100.0%]
Unit 6 EP Produzione SpA [100.0%]
Unit CCGT8 EP Produzione SpA [100.0%]
Unit CCST8 EP Produzione SpA [100.0%]
Unit GT8 EP Produzione SpA [100.0%]

Background

In 2019 EP Produzione proposed replacing Unit 8 of the power plant with a new combined cycle unit. The proposals calls for the construction to take place in two phases, an 560 MW of open cycle gas turbine and then a 290 MW steam turbine.[9] According to new reports after the project is permitted,construction will take between 36 and 48 months.[9] The project was awarded environmental authorization in April 2021.[10]

Articles and Resources

References

  1. https://web.archive.org/web/20230103182122/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 03 January 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 https://web.archive.org/web/20221129072028/https://epproduzione.com/it/attivita/produzione/tavazzano-e-montanaso/. Archived from the original on 29 November 2022. {{cite web}}: Missing or empty |title= (help)
  3. "Centrale Termoelettrica Tavazzano - Montanaso - Info - Valutazioni e Autorizzazioni Ambientali - VAS - VIA - AIA". va.mite.gov.it. Retrieved 2024-04-18.
  4. https://web.archive.org/web/20240426195203/https://ageei.eu/energia-centrale-ep-produzione-di-tavazzano-e-montanaso-al-via-nuova-unita-a-ciclo-combinato-da-800-mw/. Archived from the original on 26 April 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://www.ansaldoenergia.com/about-us/media-center/press-releases/detail-press-releases/works-begin-at-ansaldo-energia-construction-site-for-the-project-of-efficiency-of-the-ep-produzione-power-plant-of-tavazzano-and-montanaso. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20221001205726/https://primalodi.it/cronaca/presentato-il-progetto-per-la-centrale-di-tavazzano-e-montanaso/. Archived from the original on 01 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20221128044721/https://epproduzione.com/en/business/power-generation/tavazzano-and-montanaso/. Archived from the original on 28 November 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20230331180716/https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/electric-power/032123-europe-undergoes-modest-revival-in-gas-plant-construction-as-further-coal-closures-loom. Archived from the original on 31 March 2023. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 "Presentato il progetto per la centrale di Tavazzano e Montanaso". Prima Lodi. Retrieved November 5, 2021.{{cite web}}: CS1 maint: url-status (link)
  10. "Decreto del Ministero della Transizione Ecologica - Centrale termoelettrica di Tavazzano Montanaso (LO) - realizzazione di un nuovo ciclo combinato in sostituzione della sezione 8". April 16, 2021. Retrieved November 5, 2021.{{cite web}}: CS1 maint: url-status (link)