Tehachapi Pumped Storage hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Tehachapi Pumped Storage hydroelectric plant is a hydroelectric power plant in pre-construction in Lebec, Kern County, California, United States.

Project Details

Table 1: Project details for Tehachapi Pumped Storage hydroelectric plant

Status Nameplate capacity Technology type Owner
Pre-construction[1] 1000 MW[2] Pumped storage[2] Premium Energy[1]

Location

Table 2: Location details for Tehachapi Pumped Storage hydroelectric plant

Location Coordinates (WGS 84)
Lebec, Kern County, California, United States[3][4][5] 34.8414, -118.759 (approximate)[3][4][5]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 https://ferc.gov/sites/default/files/2023-12/ActivePrelimPermits_12.13.2023.xlsx. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://web.archive.org/web/20220802155503/https://www.ferc.gov/sites/default/files/2022-07/ActivePrelimPermits_7.15.2022_0.xlsx. Archived from the original on 2022-08-02. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 https://maps.app.goo.gl/u16TPrP4CFTxSMrLA. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 https://archive.org/details/20210225-5146/page/n3/mode/2up?view=theater. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://archive.org/details/20210225-5146. {{cite web}}: Missing or empty |title= (help)