Tehran-Tabriz Crude Oil Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Tehran-Tabriz Crude Oil Pipeline is an operating crude oil pipeline in Iran.[1] Two pipelines exist along the route — an original 1st Section and a more recent 2nd Section.

Location

The pipeline starts at the Tehran Refinery and runs to the Tabriz Refinery, Iran.[1]

Project details

1st Section

Loading map...
  • Operator:
  • Owner: National Iranian Oil Refining & Distribution Company (NIORDC)[2]
  • Parent company: Iran Ministry of Petroleum
  • Capacity:
  • Length: 250 kilometers
  • Diameter: 14 inches[2]
  • Status: Operating[2]
  • Start year:
  • Financing:
  • Associated projects:

2nd Section

Loading map...
  • Operator:
  • Owner: National Iranian Oil Refining and Distribution Company (NIORDC)[1]
  • Parent company: Iran Ministry of Petroleum
  • Capacity: 110,000 bpd[2]
  • Length: 250 kilometers[2][3]
  • Diameter: 16 inches[2]
  • Status: Operating[2]
  • Start year:
  • Financing:
  • Associated projects:

Background

The 2nd Section is 16 inches and is located parallel to the existing 14-inch Tehran-Tabriz Crude Oil Pipeline 1st Section, with 5 meters clearance. The pipeline routes pass through Idaloo Pumping Station and Qarachaman Pumping Station.[2]

Articles and resources

References

  1. 1.0 1.1 1.2 Kazemi, A. (January 2017). "National Iranian Oil Refining & Distribution Company (NIORDC)" (PDF). Retrieved 2020-08-05.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "Tehran-Tabriz Crude Oil Pipeline 2nd section". www.bncnetwork.net. Retrieved 2022-05-09.{{cite web}}: CS1 maint: url-status (link)
  3. "زیر اساس - 16" Crude Oil Pipeline (2nd section)Tehran/Tabriz". www.zirasas.com. Retrieved 2022-05-09.

Related GEM.wiki articles

External resources

External articles