Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project is a proposed gas pipeline in Bangladesh.[1]

Location

The pipeline would run from Tekerhat to Faridpur on one side and Barishal on the other side[2]

Loading map...

Project Details

  • Operator: GTCL[1]
  • Parent company: PETROBANGLA[1]
  • Capacity:
  • Length: 115 km / 71.46 miles [1]
  • Diameter: 30 inches[1]
  • Status: Proposed[2][1]
  • Start Year: 2028[1]
  • Cost:
  • Financing:

Background

The pipeline project is expected to start in July 2025 and would be completed by June 2028.[1]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "Existing Pipeline". GTCL. Retrieved 2021-08-24.
  2. 2.0 2.1 Annual Report 2019 (PDF). PETROBANGLA. 2020. p. 47.

Related SourceWatch articles

External resources

External articles