Teng County cogen power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Teng County cogen power station (藤县新材料产业园热电联产) is a power station in Teng County, Wuzhou, Guangxi, China with multiple units of varying statuses none of which are currently operating. It is also known as 藤县新材料产业园建晖纸业(广西)林浆纸一体化项目 (Unit 1).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Teng County cogen power station Teng County, Wuzhou, Guangxi, China 23.35669, 110.989773 (approximate)

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 construction coal - bituminous[1] 80 circulating fluidized bed 2025
Phase I Unit 2 permitted coal - bituminous[1] 50 circulating fluidized bed 2025
Phase II Unit 3 permitted coal - unknown 80 circulating fluidized bed 2025
Phase II Unit 4 permitted coal - unknown 80 circulating fluidized bed 2025

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Guangxi Wuzhou Jianhui Thermal Power Co Ltd [100.0%]
Phase I Unit 2 Guangxi Wuzhou Jianhui Thermal Power Co Ltd [100.0%]
Phase II Unit 3 Guangxi Wuzhou Jianhui Thermal Power Co Ltd [100.0%]
Phase II Unit 4 Guangxi Wuzhou Jianhui Thermal Power Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): Inner Mongolia
  • Permit(s): January 6, 2022, January 6, 2022 – 桂发改电力〔2022〕14号

Background

Teng County cogen power station allegedly consists of 4 units - 3 X 80 MW units and 1 x 50 MWm and utilizes circulating fluidized bed combustion technology.[2] The permission to build (桂发改电力〔2022〕14号) was granted on 6 January 2022 by Guangxi Provincial Development and Reform Commission.[2]

In 2020, it was reported that the project's construction was expected to begin in March 2021.[3]

In March 2023, a call for EPC bids was posted for Phase I (2 x 80 MW) of the project.[4]

In April 2023, it was reported that the project would be built in two phases, with completion expected in 2024.[5]

According to the 2023 Guangxi list of key energy projects, Unit 1 had begun construction in January 2023.[6] The 2023 list estimated that the project would be in operation by 2025.[6]

Articles and Resources

References

  1. 1.0 1.1 https://web.archive.org/web/20240218223104/http://sthjt.gxzf.gov.cn/zfxxgk/zfxxgkgl/fdzdgknr/hjjccf/hjyxpj/t11234864.shtml. Archived from the original on 18 February 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 "广西壮族自治区发展和改革委员会关于藤县新材料产业园热电联产项目核准的批复". 广西壮族自治区发展和改革委员会. 2022-01-10. Retrieved 2023-02-06.{{cite web}}: CS1 maint: url-status (link)
  3. 建晖纸业广西项目力争明年3月底前实现开工建设 ChinaPaper.net, 2020-12-16
  4. 藤县新材料产业园热电联产项目(一期工程)1*80MW抽背式汽轮 中国招标与采购网, 2023-03-22
  5. 加强协作优化服务确保项目按期建成投产丨钟畅姿到藤县调研项目建设 Sohu, 2023-04-19
  6. 6.0 6.1 广西能源基础设施建设2023年工作推进方案:加快油气及煤炭储运建设 计划完成投资44.8亿元 BJX, March 30, 2023

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.