Teng County cogen power station (藤县新材料产业园热电联产) is an operating power station of at least 80-megawatts (MW) in Teng County, Wuzhou, Guangxi, China with multiple units, some of which are not currently operating. It is also known as 藤县新材料产业园建晖纸业(广西)林浆纸一体化项目 (Unit 1).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Teng County cogen power station Teng County, Wuzhou, Guangxi, China 23.35669, 110.989773 (approximate)
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 Operating coal: bituminous[1] 80 CFB 2024
Phase I Unit 2 Construction coal: bituminous[1] 50 CFB 2025 (planned)
Phase II Unit 3 Shelved coal: unknown 80 CFB 2025 (planned)
Phase II Unit 4 Shelved coal: unknown 80 CFB 2025 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Guangxi Wuzhou Jianhui Thermal Power Co Ltd [100%] Jianhui International Industrial Co Ltd [61.4%]; Yihua Group [20.0%]; Huangyong Stock Economic Union, Zhongtang Town, Dongguan City [18.6%]
Phase I Unit 2 Guangxi Wuzhou Jianhui Thermal Power Co Ltd [100%] Jianhui International Industrial Co Ltd [61.4%]; Yihua Group [20.0%]; Huangyong Stock Economic Union, Zhongtang Town, Dongguan City [18.6%]
Phase II Unit 3 Guangxi Wuzhou Jianhui Thermal Power Co Ltd [100%] Jianhui International Industrial Co Ltd [61.4%]; Yihua Group [20.0%]; Huangyong Stock Economic Union, Zhongtang Town, Dongguan City [18.6%]
Phase II Unit 4 Guangxi Wuzhou Jianhui Thermal Power Co Ltd [100%] Jianhui International Industrial Co Ltd [61.4%]; Yihua Group [20.0%]; Huangyong Stock Economic Union, Zhongtang Town, Dongguan City [18.6%]

Project-level coal details

  • Coal source(s): Inner Mongolia
  • Permit(s): 桂发改电力〔2022〕14号

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Teng County cogen power station allegedly consists of 4 units - 3 X 80 MW units and 1 x 50 MWm and utilizes circulating fluidized bed combustion technology.[2] The permission to build (桂发改电力〔2022〕14号) was granted on 6 January 2022 by Guangxi Provincial Development and Reform Commission.[2]

In 2020, it was reported that the project's construction was expected to begin in March 2021.[3]

In March 2023, a call for EPC bids was posted for Phase I (2 x 80 MW) of the project.[4]

In April 2023, it was reported that the project would be built in two phases, with completion expected in 2024.[5]

According to the 2023 Guangxi list of key energy projects, Unit 1 had begun construction in January 2023.[6] The 2023 list estimated that the project would be in operation by 2025.[6]

Articles and Resources

References

  1. 1.0 1.1 "广西壮族自治区生态环境厅关于藤县新材料产业园热电联产项目环境影响报告书的批复 - 环境影响评价管理 - 广西壮族自治区生态环境厅网站". sthjt.gxzf.gov.cn. 2022-01-29. Archived from the original on 2024-02-18. Retrieved 2024-01-15.
  2. 2.0 2.1 "广西壮族自治区发展和改革委员会关于藤县新材料产业园热电联产项目核准的批复". 广西壮族自治区发展和改革委员会. 2022-01-10. Retrieved 2023-02-06.{{cite web}}: CS1 maint: url-status (link)
  3. 建晖纸业广西项目力争明年3月底前实现开工建设 ChinaPaper.net, 2020-12-16
  4. 藤县新材料产业园热电联产项目(一期工程)1*80MW抽背式汽轮 中国招标与采购网, 2023-03-22
  5. 加强协作优化服务确保项目按期建成投产丨钟畅姿到藤县调研项目建设 Sohu, 2023-04-19
  6. 6.0 6.1 广西能源基础设施建设2023年工作推进方案:加快油气及煤炭储运建设 计划完成投资44.8亿元 BJX, March 30, 2023