Terra Initiative solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Terra Initiative solar farm (Parque Solar Terra Initiative) is a solar photovoltaic (PV) farm in pre-construction in El Copey, Cesar, Colombia.
Project Details
Table 1: Phase-level project details for Terra Initiative solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1] | 2025 (planned)[2] | 26.7 MWp/dc[3] | PV[1] | Greenwood Energy SAS [100%][1] |
2 | Pre-construction[1] | 2025 (planned)[2] | 26.7 MWp/dc[4] | PV[1] | Greenwood Energy SAS [100%][1] |
3 | Pre-construction[1] | 2025 (planned)[2] | 26.7 MWp/dc[4] | PV[1] | Greenwood Energy SAS [100%][1] |
4 | Pre-construction[1] | 2025 (planned)[2] | 26.7 MWp/dc[4] | PV[1] | Greenwood Energy SAS [100%][1] |
5 | Pre-construction[1] | 2025 (planned)[2] | 26.7 MWp/dc[4] | PV[1] | Greenwood Energy SAS [100%][1] |
6 | Pre-construction[1] | 2025 (planned)[2] | 26.7 MWp/dc[4] | PV[1] | Greenwood Energy SAS [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Terra Initiative solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | El Copey, Cesar, Colombia[3] | 10.1409, -73.9572 (approximate)[3] |
2 | El Copey, Cesar, Colombia[3] | 10.1409, -73.9572 (approximate)[3] |
3 | El Copey, Cesar, Colombia[3] | 10.1409, -73.9572 (approximate)[3] |
4 | El Copey, Cesar, Colombia[3] | 10.1409, -73.9572 (approximate)[3] |
5 | El Copey, Cesar, Colombia[3] | 10.1409, -73.9572 (approximate)[3] |
6 | El Copey, Cesar, Colombia[3] | 10.1409, -73.9572 (approximate)[3] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 https://web.archive.org/web/20240201164509/https://www.energiaestrategica.com/greenwood-energy-desembarca-en-colombia-con-150-mw-solares-que-estaran-operativos-en-2024/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.elcolombiano.com/negocios/cual-es-el-proyecto-terra-initiativa-en-la-sierra-nevada-de-santa-marta-CI23902099.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 https://maps.app.goo.gl/KFnxxhV1UjAo1J8p6.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://maps.app.goo.gl/KFnxxhV1UjAo1J8p6 https://www.greenwood.energy/2024/07/03/the-arhuaco-people-and-greenwood-energy-officialize-the-terr%CA%8C-initi%CA%8Ctive-framework-agreement-in-nabusimake-with-strategic-allies/, https://maps.app.goo.gl/KFnxxhV1UjAo1J8p6.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)