Tervajoensuo solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Hallanvahti, JoSoleilTwo, Joroinen Tervajoensuo
Tervajoensuo solar farm is a solar photovoltaic (PV) farm under construction in Tervajoensuo, Joroinen, Pohjois-Savo, Finland.
Project Details
Table 1: Phase-level project details for Tervajoensuo solar farm
| Status | Commissioning year | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|
| Construction[1] | 2026 (planned)[2] | 130 MWp/dc[3] | PV[3] | 3Flash Solar Oy[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Tervajoensuo solar farm
| Location | Coordinates (WGS 84) |
|---|---|
| Tervajoensuo, Joroinen, Pohjois-Savo, Finland[4] | 62.1188, 27.7981 (approximate)[4] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://yle.fi/a/74-20143822.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://storage.mfn.se/db475d17-55a8-4649-b5a7-43f1d2575f61/eltel-interim-report-january-september-2025.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 https://www.3flash.fi/joroinen-tervajoensuo/.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://aurinkosahkovoimalat.fi/voimala/131/?plantStatus=15&minPower=20&maxPower=600.
{{cite web}}: Missing or empty|title=(help)
