Tervajoensuo solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Hallanvahti, JoSoleilTwo, Joroinen Tervajoensuo

Tervajoensuo solar farm is a solar photovoltaic (PV) farm under construction in Tervajoensuo, Joroinen, Pohjois-Savo, Finland.

Project Details

Table 1: Phase-level project details for Tervajoensuo solar farm

Status Commissioning year Nameplate capacity Technology Owner
Construction[1] 2026 (planned)[2] 130 MWp/dc[3] PV[3] 3Flash Solar Oy[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Tervajoensuo solar farm

Location Coordinates (WGS 84)
Tervajoensuo, Joroinen, Pohjois-Savo, Finland[4] 62.1188, 27.7981 (approximate)[4]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://yle.fi/a/74-20143822. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://storage.mfn.se/db475d17-55a8-4649-b5a7-43f1d2575f61/eltel-interim-report-january-september-2025.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://www.3flash.fi/joroinen-tervajoensuo/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://aurinkosahkovoimalat.fi/voimala/131/?plantStatus=15&minPower=20&maxPower=600. {{cite web}}: Missing or empty |title= (help)