Texada LNG Terminal
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Texada LNG Terminal is a cancelled (inferred 4 y) LNG import terminal in Canada.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Texada LNG Terminal | Texada Island, British Columbia, Canada[1] | 49.666667, -124.416667 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Texada LNG Terminal | import[2] | cancelled (inferred 4 y) | 3.8 mtpa[3] | 3.8 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Texada LNG Terminal | import[2] | – | – |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Texada LNG Terminal | import[2] | cancelled (inferred 4 y) | – | – | – | – | 2009 (cancelled)[2] |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Texada LNG Terminal | import[2] | cancelled (inferred 4 y) | WestPac LNG Corp [100%][4] | WestPac LNG Corp [100.0%] | – |
Background
Texada LNG Terminal was a proposed LNG terminal in British Columbia, Canada.[5]In 2007, Westpac LNG announced that it intended to build a liquefied natural gas (LNG) receiving terminal, and a gas-fired electricity generation project, at Kiddie Point on the north end of Texada. Controversy surrounding the project ramped up quickly: the year also witnessed the re-introduction of Texada Action Now by Texada residents,and the formation of the Alliance to Stop LNG, comprising a large number of conservation, environmental, community and labour groups around the Georgia Basin. As of summer 2009, the project was shelved for the time being due to the global economic downturn.[5]
Opposition
The Texada LNG is being opposed by dozens of environmental and community groups including The Sunshine Coast Conservation Association. The groups are making their voices heard to the Premier Gordon Campbell's Climate Action Team. The groups argue that it is hypocritical for Canada to attempt to reduce greenhouse gas emissions while allowing the importation and burning of fossil fuels for electricity generation.[6]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ https://www.google.com/maps/place/49%C2%B040'00.0%22N+124%C2%B025'00.0%22W/@49.666667,-124.4192419,721m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d49.666667!4d-124.416667?entry=ttu&g_ep=EgoyMDI1MDYyMi4wIKXMDSoASAFQAw%3D%3D.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://www.theglobeandmail.com/report-on-business/westpac-changes-plan-for-lng-terminal/article18141712/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.cer-rec.gc.ca/en/data-analysis/energy-commodities/natural-gas/report/archive/liquefied-natural-gas-canadian-perspective/liquefied-natural-gas-canadian-perspective-energy-market-assessment.html.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.ogj.com/pipelines-transportation/article/17285897/westpac-plans-texada-island-lng-terminal.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 Texada LNG Terminal, Wikipedia, accessed April 2017
- ↑ Overview of Texada Liquefied Natural Gas Campaign Sunshine Coast Conservation Association, accessed June 15, 2017
