Texas Critical Data Center

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Texas Critical Data Center is a power station in pre-construction in Ector, Texas, United States.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Texas Critical Data Center Ector, Texas, United States 31.961746, -102.4559567 (approximate)[1]
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
1 Pre-construction[2][3][4][1] fossil gas: natural gas[2] 100[1] internal combustion[2] 2026 (planned)[1]
2 Pre-construction[2][3][4][1] fossil gas: natural gas[2] 150[1] internal combustion[2] 2027 (planned)[1]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1 PowerForward Energy Solutions[1] Texas Critical Data Centers LLC[1] New Era Helium Inc; SharonAI Holdings Inc
2 PowerForward Energy Solutions[1] Texas Critical Data Centers LLC[1] New Era Helium Inc; SharonAI Holdings Inc

Project-level captive use details

  • Captive industry use (heat or power): power[1]
  • Captive industry: Data Center[1]


Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://www.datacenterdynamics.com/en/news/texas-critical-data-centers-signs-mou-for-onsite-gas-generation-at-250mw-ai-data-center-in-texas/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://www.newerahelium.com/news/new-era-helium-initiates-phase-1-of-250mw-data-center-project-and-launches-related-website. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.datacenterdynamics.com/en/news/tcdc-closes-235-acre-land-acquisition-for-ai-data-center-in-ector-county-texas/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://www.texascriticaldatacenters.com/2025/06/19/sharon-ai-and-new-era-helium-announce-memorandum-of-understanding-with-powerforward-energy-solutions-for-intended-250mw-ai-hpc-data-center-project-in-texas/. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.