The Patima-Livadeia Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

The Patima-Livadeia Gas Pipeline is a proposed gas pipeline in Greece.[1]

Location

The pipeline runs from Megara to Livadeia.[1]

Project details

Main Line

  • Operator:
  • Owner:
  • Parent company:
  • Capacity:
  • Length: 100 km[1]
  • Diameter: 30 in[1]
  • Status: proposed[1]
  • Start Year: 2027[1]
  • Cost: €150 million[1]
  • Financing:
  • Associated infrastructure:

Background

DESFA reported that a FID for the pipeline would be made by the end of 2025. The pipeline route will run parallel to an existing pipeline.

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Draft Ten-Year Development Plan (TYDP) 2024–2033" (PDF). DESFA. Hellenic Gas Transmission System Operator (DESFA) S.A. 2025-02-27. Retrieved 2025-09-16.