The Patima-Livadeia Gas Pipeline is a proposed gas pipeline in Greece.[1]

Location

The pipeline runs from Megara to Livadeia.[1]

Project details

Main Line

  • Operator:
  • Owner:
  • Parent company:
  • Capacity:
  • Length: 100 km[1]
  • Diameter: 30 in[1]
  • Status: proposed[1]
  • Start Year: 2027[1]
  • Cost: €150 million[1]
  • Financing:
  • Associated infrastructure:

Background

DESFA reported that a FID for the pipeline would be made by the end of 2025. The pipeline route will run parallel to an existing pipeline.