Thunderhead Wind Energy
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Thunderhead Wind Energy is an operating wind farm in Boone, Antelope County, Nebraska, United States.
Project Details
Table 1: Phase-level project details for Thunderhead Wind Energy
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2022[1] | 300 MW[1] | Onshore[2] | WEC Energy Group [100%][3] | Invenergy[2] |
Location
Table 2: Phase-level location details for Thunderhead Wind Energy
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Boone, Antelope County, Nebraska, United States[1] | 42.0901, -98.2319 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.0 2.1 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ https://web.archive.org/web/20210908092720/https://investor.wecenergygroup.com/investors/news-releases/press-release-details/2019/WEC-Energy-Group-to-acquire-80-ownership-in-Thunderhead-wind-Energy-Center/default.aspx. Archived from the original on 08 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)