Tikuna F1 solar farm (Planta Solar Tikuna F1) is a solar photovoltaic (PV) farm in pre-construction in Sahagun, Cordoba, Colombia.

Project Details

Table 1: Phase-level project details for Tikuna F1 solar farm

Phase name Status Commissioning year Nameplate capacity Technology Operator
S1 Pre-construction[1] 2025 (planned)[2] 19.8 MWac[3] PV[1] Parque Solar Tikuna F1[1]
S2 Pre-construction[1] 2025 (planned)[2] 19.8 MWac[3] PV[1] Parque Solar Tikuna F1[1]
S3 Pre-construction[1] 2025 (planned)[2] 19.8 MWac[3] PV[1] Parque Solar Tikuna F1[1]
S4 Pre-construction[1] 2025 (planned)[2] 19.8 MWac[3] PV[1] Parque Solar Tikuna F1[1]
S5 Pre-construction[1] 2025 (planned)[2] 19.8 MWac[3] PV[1] Parque Solar Tikuna F1[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Tikuna F1 solar farm

Phase Name Location Coordinates (WGS 84)
S1 Sahagun, Cordoba, Colombia[3] 8.9453, -75.4424 (approximate)[3]
S2 Sahagun, Cordoba, Colombia[3] 8.9453, -75.4424 (approximate)[3]
S3 Sahagun, Cordoba, Colombia[3] 8.9453, -75.4424 (approximate)[3]
S4 Sahagun, Cordoba, Colombia[3] 8.9453, -75.4424 (approximate)[3]
S5 Sahagun, Cordoba, Colombia[3] 8.9453, -75.4424 (approximate)[3]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 "Colombia, Sistema de Informacion Eléctrico Colombiano (SIEL), Informe de Registro de Proyectos de Generación de Energía Eléctrica, 2020". Informe de Registro de Proyectos de Generación de Energía Eléctrica. Archived from the original on 2024-01-25. Retrieved January 4, 2021.
  2. 2.0 2.1 2.2 2.3 2.4 https://www.power-technology.com/data-insights/power-plant-profile-tikuna-park-solar-farm-1-colombia/. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.