Tikuna F1 solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Tikuna F1 solar farm (Planta Solar Tikuna F1) is a solar photovoltaic (PV) farm in pre-construction in Sahagun, Cordoba, Colombia.
Project Details
Table 1: Phase-level project details for Tikuna F1 solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Operator |
---|---|---|---|---|---|
S1 | Pre-construction[1] | 2025 (planned)[2] | 19.8 MWac[3] | PV[1] | Parque Solar Tikuna F1[1] |
S2 | Pre-construction[1] | 2025 (planned)[2] | 19.8 MWac[3] | PV[1] | Parque Solar Tikuna F1[1] |
S3 | Pre-construction[1] | 2025 (planned)[2] | 19.8 MWac[3] | PV[1] | Parque Solar Tikuna F1[1] |
S4 | Pre-construction[1] | 2025 (planned)[2] | 19.8 MWac[3] | PV[1] | Parque Solar Tikuna F1[1] |
S5 | Pre-construction[1] | 2025 (planned)[2] | 19.8 MWac[3] | PV[1] | Parque Solar Tikuna F1[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Tikuna F1 solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
S1 | Sahagun, Cordoba, Colombia[3] | 8.9453, -75.4424 (approximate)[3] |
S2 | Sahagun, Cordoba, Colombia[3] | 8.9453, -75.4424 (approximate)[3] |
S3 | Sahagun, Cordoba, Colombia[3] | 8.9453, -75.4424 (approximate)[3] |
S4 | Sahagun, Cordoba, Colombia[3] | 8.9453, -75.4424 (approximate)[3] |
S5 | Sahagun, Cordoba, Colombia[3] | 8.9453, -75.4424 (approximate)[3] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 "Colombia, Sistema de Informacion Eléctrico Colombiano (SIEL), Informe de Registro de Proyectos de Generación de Energía Eléctrica, 2020". Informe de Registro de Proyectos de Generación de Energía Eléctrica. Archived from the original on 2024-01-25. Retrieved January 4, 2021.
- ↑ 2.0 2.1 2.2 2.3 2.4 https://www.power-technology.com/data-insights/power-plant-profile-tikuna-park-solar-farm-1-colombia/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.