Tingo 1 hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Tingo 1 hydroelectric plant (Central Hidroeléctrica Tingo 1) is a shelved hydroelectric power plant in Cajaruro, Utcubamba, Amazonas, Peru.
Project Details
Table 1: Project details for Tingo 1 hydroelectric plant
| Status | Nameplate capacity | Turbines | Technology type | Owner |
|---|---|---|---|---|
| Shelved[1] | 210 MW[1] | 3 x 54 MW[1] | Run-of-river[1] | Energoret [100%][2] |
Location
Table 2: Location details for Tingo 1 hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Cajaruro, Utcubamba, Amazonas, Peru[1][2] | Río Utcubamba[1] | -5.7592, -78.4507 (approximate)[1][2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 (PDF) https://web.archive.org/web/20211015230304/https://www.osinergmin.gob.pe/seccion/centro_documental/electricidad/Documentos/Publicaciones/Compendio-Proyectos-GTE-Construccion.pdf. Archived from the original (PDF) on 2021-10-15.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20230130000302/https://www.rumbominero.com/peru/noticias/energia/energoret-recibe-concesion-definitiva-para-tingo-ii-y-iii/. Archived from the original on 2023-01-30.
{{cite web}}: Missing or empty|title=(help)
