Tivissa (Desarrollos Eólicos Tivissa) wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Tivissa (Desarrollos Eólicos Tivissa) wind farm is a wind farm in pre-construction in Tivissa, Segarra, Cataluña, Spain.

Project Details

Table 1: Phase-level project details for Tivissa (Desarrollos Eólicos Tivissa) wind farm

Phase name Status Nameplate capacity Type Owner
1 Shelved (inferred February 2024) 49.6 MW[1] Onshore[1] Desarrollos Eólicos Tivissa I SL [100%][1]
2 Pre-construction[2] 49.6 MW[3] Onshore[3] Desarrollos Eólicos Tivissa II SL [100%][3]
3 Pre-construction[4] 49.6 MW[5] Onshore[5] Desarrollos Eólicos Tivissa III SL [100%][5]
4 Pre-construction[6] 49.6 MW[7] Onshore[7] Desarrollos Eólicos Tivissa IV SL [100%][7]
5 Shelved (inferred February 2024) 49.6 MW[8] Onshore[8] Desarrollos Eólicos Tivissa V SL [100%][8]

Location

Table 2: Phase-level location details for Tivissa (Desarrollos Eólicos Tivissa) wind farm

Phase Name Location Coordinates (WGS 84)
1 Tivissa, Segarra, Cataluña, Spain[1] 41.7418, 1.2925 (approximate)[1]
2 Tivissa, Segarra, Cataluña, Spain[3] 41.7418, 1.2925 (approximate)[3]
3 Tivissa, Ribera d'Ebre, Cataluña, Spain[5] 41.0416, 0.7346 (approximate)[5]
4 Tivissa, Segarra, Cataluña, Spain[7] 41.7418, 1.2925 (approximate)[7]
5 el Perelló, Baix Ebre, Cataluña, Spain[8] 40.8754, 0.7124 (approximate)[8]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental del projecte de Parc eòlic Tivissa I". Generalitat de Catalunya. 2020-11-05. Archived from the original on 2024-02-19.
  2. http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=bd77e6d9089a41858b01f8a50bb36299 https://govclipping.com/es/catalunya/boa/2023-10-09/9448-departamento-accion-climatica-alimentacion-agenda-rural-anuncios-dogc-n-2023-9016, http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=bd77e6d9089a41858b01f8a50bb36299. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental del projecte "Parc Eòlic TIVISSA II". Generalitat de Catalunya. 2020-11-05. Archived from the original on 2024-02-19.
  4. https://www.diarimes.com/ca/camp-tarragona/230529/projecten-dos-parcs-solars-fotovoltaics-conca-barbera-urgell_132435.html http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=612b90bf6f6a4bf3a9d4cc72ae26ce27, https://www.diarimes.com/ca/camp-tarragona/230529/projecten-dos-parcs-solars-fotovoltaics-conca-barbera-urgell_132435.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental del projecte "Parc Eòlic Tivissa III"". Generalitat de Catalunya. 2020-11-05. Archived from the original on 2024-02-19.
  6. http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=724f4758c63c47f980ef0c4efb0be033 https://www.aguaita.cat/noticia/27831/sinicien-els-tramits-per-construir-un-parc-eolic-amb-vuit-aerogeneradors-a-tivissa, http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=724f4758c63c47f980ef0c4efb0be033. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental del projecte "Parc Eòlic Tivissa IV" als termes municipals de Tivissa, l'Ametlla de Mar i Vandellòs i l'Hospitalet de l'Infant (Ribera d'Ebre, Baix Ebre i Baix Camp)". Generalitat de Catalunya. 2020-11-05. Archived from the original on 2024-02-19.
  8. 8.0 8.1 8.2 8.3 8.4 "Acord sobre la viabilitat de l'emplaçament de l'avantprojecte "Instal·lació de producció d'energia elèctrica eòlica d 49,6 MW Perelló-Tivissa V", al terme municipal del Perelló". Generalitat de Catalunya. 2020-11-05. Archived from the original on 2024-02-19.