Tivissa (Naturgy) wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Tivissa (Naturgy) wind farm is a cancelled wind farm in Tivissa, Ribera d'Ebre, Cataluña, Spain.
Project Details
Table 1: Phase-level project details for Tivissa (Naturgy) wind farm
Phase name | Status | Nameplate capacity | Type | Owner |
---|---|---|---|---|
1 | Cancelled (inferred February 2024) | 37.8 MW[1] | Onshore[1] | Naturgy Energy Group SA [100%][2] |
2 | Cancelled (inferred February 2024) | 37.8 MW[3] | Onshore[3] | Naturgy Energy Group SA [100%][4] |
Location
Table 2: Phase-level location details for Tivissa (Naturgy) wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Tivissa, Ribera d'Ebre, Cataluña, Spain[1] | 41.0416, 0.7346 (approximate)[1] |
2 | Tivissa, Ribera d'Ebre, Cataluña, Spain[1] | 41.0416, 0.7346 (approximate)[1] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental del projecte Parc eòlics Tivissa I, sol·licitat per Naturgy Renovables, SLU, als termes municipals de Tivissa, Vandellòs i l'Hospitalet de l'Infant, Ginestar, Mora la Nova i Garcia, Ribera d'Ebre i Baix Camp". Generalitat de Catalunya. 2020-02-28. Archived from the original on 2024-02-19.
- ↑ http://infoanoia.cat/nous-projectes-parcs-eolics-preveu-vintena-nous-molins-lanoia/ http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=04becab97cdd49588c480c1114daae4a, http://infoanoia.cat/nous-projectes-parcs-eolics-preveu-vintena-nous-molins-lanoia/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental del projecte Parc eòlic Tivissa-II, sol·licitat per Naturgy Renovables, SLU, als termes municipals de Tivissa, Vandellòs i l'Hospitalet de l'Infant, Ginestar, Mora la Nova i Garcia (Ribera d'Ebre i Baix Camp". Generalitat de Catalunya. 2020-02-28. Archived from the original on 2024-02-19.
- ↑ http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=1d0e0f06c84c4947906ae7668d701c5b http://infoanoia.cat/nous-projectes-parcs-eolics-preveu-vintena-nous-molins-lanoia/, http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=1d0e0f06c84c4947906ae7668d701c5b.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)