Toba Pulp Lestari power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Toba Pulp Lestari power station is an operating power station of at least 50-megawatts (MW) in Parmaksian, Toba, Sumatera, Indonesia with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Toba Pulp Lestari power station Parmaksian, Toba, Sumatera, Indonesia 2.4636762, 99.1972775 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 2.4636762, 99.1972775

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Operating[1] coal: unknown, bioenergy: paper mill wastes, bioenergy: bio-heavy oil, bioenergy: agricultural waste (solids)[1] 50[1] unknown 2014 False
Unit 2 Mothballed[1] coal: unknown, bioenergy: paper mill wastes, bioenergy: bio-heavy oil, bioenergy: agricultural waste (solids)[1] 30[1] unknown 2014 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 PT Toba Pulp Lestari Tbk [100%][1] PT Toba Pulp Lestari Tbk [100.0%]
Unit 2 PT Toba Pulp Lestari Tbk [100%][1] PT Toba Pulp Lestari Tbk [100.0%]

Project-level captive use details

  • Captive industry: Pulp & Paper[1]


Project-level coal details

  • Coal source(s): unknown

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

PT Toba Pulp Lestari operates a pulp mill in Toba, North Sumatra, Indonesia. The facility was powered by a captive coal plant with one 50 MW unit and one 30 MW unit. The units co-fired with paper mill wastes, black liquor, and palm kernel shells. The smaller unit was reportedly on standby.[2]

The exact start year of the power station was unknown.

Permit revoked

In January 2026, the Indonesian government revoked Toba Pulp Lestari's forest utilization permit. The company, along with 27 others, allegedly violated environmental and forestry regulations which were said to contribute to a deadly landslide event in late 2025. Several communities that overlapped the Toba Pulp Lestari concession sought the return of their land.[3]

In April 2026, the company reportedly laid of 80% of their workforce.[4]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://www.scribd.com/document/436353856/Laporan-KP-Kerja-Praktek-Toba-Pulp-Lestari. {{cite web}}: Missing or empty |title= (help)
  2. ↑ Sistem PLTU di PT Toba Pulp Lestari, Scribd, accessed April 9, 2026
  3. ↑ Indonesian communities push to reclaim lands following company permit revocations, Mongabay, March 6, 2026
  4. ↑ Toba Pulp Lestari to lay off 80% of workforce after license revocation, The Jakarta Post, April 30, 2026