Toek Phos solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Schneitec Tek Phos solar farm, Schneitec Tek Phos Pv, Kampong Chhnang I
Toek Phos solar farm is an operating solar photovoltaic (PV) farm in Taing Krasaing, Toek Phos, Kampong Chhang, Cambodia.
Project Details
Table 1: Phase-level project details for Toek Phos solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2020[2] | 60 MWac[3] | PV[3] | SchneiTec Renewable Company LTD[3] | SchneiTec Renewable Company LTD[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Toek Phos solar farm
Location | Coordinates (WGS 84) |
---|---|
Taing Krasaing, Toek Phos, Kampong Chhang, Cambodia[1][3] | 12.0860, 104.5170 (exact)[4] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://numerical.co.in/numerons/collection/603f0911cca6110490295103.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.phnompenhpost.com/business/new-solar-farm-hooks-national-grid.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://www.khmertimeskh.com/712430/third-solar-power-station-joins-national-grid/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Wiki-Solar Database". https://wiki-solar.org/. April, 2023. Adapted with permission.
{{cite web}}
: Check date values in:|date=
(help); External link in
(help)CS1 maint: url-status (link)|website=