Tokuyama East power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
This article is part of the Global Bioenergy Power Tracker, a Global Energy Monitor project. |
Tokuyama East power station (徳山製造所 東発電所) is an operating power station of at least 445-megawatts (MW) in East power station, Shunan, Yamaguchi, Chūgoku, Japan. It is also known as Marubeni Tokuyama Steam Plant (Cogen), Tokuyama East Power Generation No. 3 (Unit 3), Shunan Biomass, Tokuyama Higashi Power Station, Tokuyama East Power Generation.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Tokuyama East power station | East power station, Shunan, Yamaguchi, Chūgoku, Japan | 34.03653, 131.79395 (exact) |
Unit-level coordinates (WGS 84):
- Unit 2, Unit 3, timepoint1: 34.03653, 131.79395
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 2 | Operating | coal: unknown | 145 | subcritical | 1999 |
Unit 3, timepoint 2 | Pre-construction[1] | bioenergy: wood & other biomass (solids) [51%], coal: unknown [49%][1] | 300[1] | – | 2025 (planned)[1] |
Unit 3, timepoint1 | Operating | coal: unknown [61%], bioenergy: wood & other biomass (solids) [29%][1] | 300 | subcritical | 2022 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 2 | Tokuyama Corp [100%] | Tokuyama Corp [100.0%] |
Unit 3, timepoint 2 | Shunan Power Corp [100%] | Tokyo Century Corp [60.0%]; Marubeni Corp [20.0%]; Tokuyama Corp [20.0%] |
Unit 3, timepoint1 | Shunan Power Corp [100%] | Tokyo Century Corp [60.0%]; Marubeni Corp [20.0%]; Tokuyama Corp [20.0%] |
Unit-level fuel conversion details:
Unit 3, timepoint1: Conversion in pre-construction phase from coal to bioenergy in 2025.
Background
The power station is owned by Tokuyama and the Shunan Power corporation, and is located in Shū, Yamaguchi, Chūgoku Prefecture, Japan.[2] It is located by the Tokuyama Central power station.
The power station includes a 300 MW coal- and biomass-fired power station. The proposal was also known as Tokuyama East Power Generation No. 3.[3][4]
According to the Kiko Network, the power station's new unit entered construction in 2018 and was scheduled to go online in 2022. [5]Though Unit 3 was slated to come online in April 2022, there was no news on its operation in June 2022.[6]
In September 2022, Unit 3 entered commercial operation. The unit was run by Shunan Power Corporation, which changed its name from TKE3.[7]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://shunanpower.co.jp/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Map & Data, Japan Beyond Coal, accessed in 2021
- ↑ 徳山製造所東発電所第3号発電設備計画 株式会社トクヤマ, METI, accessed in 2021
- ↑ 東3号発電設備の建設について, Tokuyama, September 29, 2017
- ↑ Tokuyama East Power Generation No.3, Kiko Network, accessed February 2019
- ↑ JBC Coal Plant Data Summary, Beyond Coal Japan, March 1, 2022
- ↑ 周南パワー株式会社の発電所の商業運転開始について, ニュースNEWS, September 1, 2022
Additional data
To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Bioenergy Power Tracker and the Global Coal Plant Tracker on the Global Energy Monitor website.