Tonghua Xuangang power station (晋能控股漳泽电力同华轩岗发电厂) is an operating power station of at least 1320-megawatts (MW) in Xuangang, Yuanping, Xinzhou, Shanxi, China with multiple units, some of which are not currently operating. It is also known as Tongfa Xuangang power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Tonghua Xuangang power station Xuangang, Yuanping, Xinzhou, Shanxi, China 38.9151455, 112.4765897 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 38.9151455, 112.4765897

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 Operating coal: bituminous 660 supercritical 2010
Phase I Unit 2 Operating coal: bituminous 660 supercritical 2010
Phase II Unit 3 Permitted[1] coal: bituminous 660 ultra-supercritical
Phase II Unit 4 Permitted coal: bituminous 660 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Shanxi Zhangzhe POWER Tonhua Generation Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [95.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [2.9%]; Jinneng Group Co Ltd [1.1%]; unknown [0.7%]; Jinneng Holding Group Co Ltd [0.3%]
Phase I Unit 2 Shanxi Zhangzhe POWER Tonhua Generation Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [95.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [2.9%]; Jinneng Group Co Ltd [1.1%]; unknown [0.7%]; Jinneng Holding Group Co Ltd [0.3%]
Phase II Unit 3 Shanxi Zhangzhe POWER Tonhua Generation Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [95.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [2.9%]; Jinneng Group Co Ltd [1.1%]; unknown [0.7%]; Jinneng Holding Group Co Ltd [0.3%]
Phase II Unit 4 Shanxi Zhangzhe POWER Tonhua Generation Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [95.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [2.9%]; Jinneng Group Co Ltd [1.1%]; unknown [0.7%]; Jinneng Holding Group Co Ltd [0.3%]

Project-level coal details

  • Permit(s): 晋发改审批发〔2024〕317号[2]

Background

The two existing coal-fired units of Tonghua Xuangang power station, totaling 1,320 MW, were brought online in 2010. The plant is owned by Datong Coal Mining Group.[3][4]

Description of Expansion

Datong Coal is currently planning to build two additional coal-fired units at this plant, with a total planned capacity of 1,320 MW. The new units were scheduled to be completed in 2015,[5][6] but as of June 2015 the units have yet to receive environmental clearance for construction.[7]

Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

In January 2017 China's National Energy Administration suspended over 100 planned and under-construction coal power projects with a total capacity of over 100GW in 13 provinces, including Tonghua Xuangang. It is unclear when or if the projects will be revived.[8]

For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

2019: Project revived

In April 2019, Zhangze Power said that units 3-4 had been removed from the central government's list of postponed projects.[9]

As of July 2020, the expansion was expected to begin construction in 2021.[10]

In July 2022, with no apparent developments in over two years, Units 3 and 4 were presumed to be shelved.

Articles and Resources

References

  1. "晋控电力回应亏损:火电机组燃煤成本高以及受电力市场省间交易规则调整影响-北极星火力发电网". news.bjx.com.cn. 2024-02-08. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
  2. https://news.bjx.com.cn/html/20241204/1414788.shtml. {{cite web}}: Missing or empty |title= (help)
  3. "同煤集团同华发电公司轩岗2x660MW坑口电厂双机投产", 同煤网站, 2010-07-08
  4. "大同煤矿集团同华发电有限公司轩岗电厂(2×660MW)二期扩建工程环境影响评价第二次公示", 忻州在线, 2013-08-22
  5. "央企首次退出地方火电 大同煤业接手漳泽电力", 网易财经, 2011-10-29
  6. "漳泽电力:关于共同出资设立同华二期发电项目公司的关联交易公告", 中国互联网新闻中心, 2014-03-29
  7. "一路奋进铸辉煌——同华发电公司创业纪实," sxzdthfd.com, Jun 16, 2015
  8. "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
  9. "漳泽电力:2018年年度报告," Zhangze Power, 2019年04月26日
  10. "同华轩岗电厂二期2×66万千瓦项目预计2021年开工," news.bjx.com, 2020-07-14

Additional data