Tonghua Xuangang power station (晋能控股漳泽电力同华轩岗发电厂) is an operating power station of at least 1320-megawatts (MW) in Xuangang, Yuanping, Xinzhou, Shanxi, China with multiple units, some of which are not currently operating. It is also known as Tongfa Xuangang power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Tonghua Xuangang power station Xuangang, Yuanping, Xinzhou, Shanxi, China 38.9151455, 112.4765897 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 38.9151455, 112.4765897

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - bituminous 660 supercritical 2010
Phase I Unit 2 operating coal - bituminous 660 supercritical 2010
Phase II Unit 3 shelved coal - bituminous 660 ultra-supercritical
Phase II Unit 4 shelved coal - bituminous 660 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 Shanxi Zhangzhe POWER Tonhua Generation Co Ltd [100.0%]
Phase I Unit 2 Shanxi Zhangzhe POWER Tonhua Generation Co Ltd [100.0%]
Phase II Unit 3 Shanxi Zhangzhe POWER Tonhua Generation Co Ltd [100.0%]
Phase II Unit 4 Shanxi Zhangzhe POWER Tonhua Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): April 12, 2010

Background

The two existing coal-fired units of Tonghua Xuangang power station, totaling 1,320 MW, were brought online in 2010. The plant is owned by Datong Coal Mining Group.[1][2]

Description of Expansion

Datong Coal is currently planning to build two additional coal-fired units at this plant, with a total planned capacity of 1,320 MW. The new units were scheduled to be completed in 2015,[3][4] but as of June 2015 the units have yet to receive environmental clearance for construction.[5]

Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

In January 2017 China's National Energy Administration suspended over 100 planned and under-construction coal power projects with a total capacity of over 100GW in 13 provinces, including Tonghua Xuangang. It is unclear when or if the projects will be revived.[6]

For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

2019: Project revived

In April 2019, Zhangze Power said that units 3-4 had been removed from the central government's list of postponed projects.[7]

As of July 2020, the expansion was expected to begin construction in 2021.[8]

In July 2022, with no apparent developments in over two years, Units 3 and 4 were presumed to be shelved.