Topolobampo III power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Topolobampo III power station (Central ciclo combinado Topolobampo III) is an operating power station of at least 766-megawatts (MW) in Ahome - Los Mochis, Sinaloa, Mexico.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Topolobampo III power station Ahome - Los Mochis, Sinaloa, Mexico 25.973403, -108.995058 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1: 25.973403, -108.995058

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 operating[2][3] fossil gas - natural gas[4][5] 766[6][3] combined cycle[7] 2024[2][8][3]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Mexico Infrastructure Partners SAPI de CV (MIP) [100.0%]

Articles and Resources

References

  1. "CCC Topolobampo Tres · Sinaloa, Mexico". Google Maps.
  2. 2.0 2.1 https://web.archive.org/web/20240212212512/https://www.powermag.com/ge-vernova-iberdrola-mexico-bring-new-gas-fired-plant-online/. Archived from the original on 12 February 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240416061833/https://www.iberdrolamexico.com/boletines/anuncian-ge-vernova-e-iberdrola-mexico-la-entrada-en-operacion-de-la-central-topolobampo-iii/. Archived from the original on 16 April 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20240125110628/https://expansion.mx/empresas/2022/05/12/cfe-reclama-iberdrola-pago-190-mdd-arbitraje-internacional. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240125094600/https://www.naturalgasintel.com/cfe-tender-for-topolobampo-branch-pipeline-goes-to-gas-natural-del-noroeste/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240416062015/https://www.iberdrola.com/sala-comunicacion/noticias/detalle/iberdrola-cierra-venta-negocio-ciclos-combinados-en-mexico-por-6200-millones-de-dolares. Archived from the original on 16 April 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240125113526/https://www.iberdrolageneracionmexico.com/ciclo-combinado-topolobampo-iii/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240416061947/https://www.gevernova.com/news/press-releases/ge-vernova-and-iberdrola-announce-topolobampo-iii-power-plant-comes-online-in-mexico. Archived from the original on 16 April 2024. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.