Tordesillas (Azucena New Energy) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Tordesillas (Azucena New Energy) solar farm (Planta fotovoltaica Tordesillas Solar PV) is a solar photovoltaic (PV) farm in pre-construction in San Román de Hornija, Valladolid, Castilla y León, Spain.

Project Details

Table 1: Phase-level project details for Tordesillas (Azucena New Energy) solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 286.9 MWac[1] PV[1] Best Wonder Business [100%][2] Azucena New Energy[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Tordesillas (Azucena New Energy) solar farm

Location Coordinates (WGS 84)
San Román de Hornija, Valladolid, Castilla y León, Spain[1] 41.5016, -5.2645 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "BOE-A-2024-2633 Resolución de 17 de enero de 2024, de la Dirección General de Política Energética y Minas, por la que se otorga a Azucena New Energy, SL, autorización administrativa previa y autorización administrativa de construcción para la instalación fotovoltaica "Tordesillas Solar PV", de 286,910 MW de potencia instalada, 299,994 MW de potencia pico". Boletín Oficial del Estado. 2024-02-12. Archived from the original on 2024-03-27. Retrieved 2024-03-20.
  2. "35 GW fotovoltaicos en tramitación en España avanzan hacia el ready to build". Energía Estratégica España. 2024-02-06. Archived from the original on 2024-04-16. Retrieved 2024-04-15.