Tramuntana wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Tramuntana wind farm is a wind farm in pre-construction in Flix, Ribera d'Ebre, Cataluña, Spain.
Project Details
Table 1: Phase-level project details for Tramuntana wind farm
| Phase name | Status | Nameplate capacity | Type | Owner | Operator |
|---|---|---|---|---|---|
| 1 | Shelved (inferred March 2025) | 50 MW[1] | Onshore[1] | ABO Wind España SA [100%][2] | Energia Eólica Tramontana[1] |
| 112 mw (2023 proposal) | Pre-construction[3] | 70 MW[3] | Onshore[4] | Energia Eólica Tramontana SL [100%][4] | – |
| 2 | Cancelled (inferred February 2024) | 50 MW[5] | Onshore[5] | ABO Wind España SA [100%][6] | ABO Wind España[5] |
| 3 | Cancelled (inferred February 2024) | 50 MW[7] | Onshore[7] | ABO Wind España SA [100%][8] | Energia Eólica Tramontana[7] |
| 4 | Cancelled (inferred February 2024) | 50 MW[9] | Onshore[9] | ABO Wind España SA [100%][8] | Energia Eólica Tramontana[9] |
| 5 | Cancelled (inferred March 2025) | 50 MW[10] | Onshore[10] | ABO Wind España SA [100%][8] | Energia Eólica Tramontana[10] |
Location
Table 2: Phase-level location details for Tramuntana wind farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Flix, Ribera d'Ebre, Cataluña, Spain[1] | 41.2340, 0.5561 (approximate)[1] |
| 112 mw (2023 proposal) | Ascó, Tarragona, Cataluña, Spain[4] | 41.1833, 0.5739 (approximate)[4] |
| 2 | Riba-roja d'Ebre, Ribera d'Ebre, Cataluña, Spain[5] | 41.1327, 0.6043 (approximate)[5] |
| 3 | Corbera d'Ebre, Terra Alta, Cataluña, Spain[7] | 41.0776, 0.4777 (approximate)[7] |
| 4 | Corbera d'Ebre, Terra Alta, Cataluña, Spain[9] | 41.0776, 0.4777 (approximate)[9] |
| 5 | Gandesa, Terra Alta, Cataluña, Spain[10] | 41.0520, 0.4389 (approximate)[10] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Acord sobre la viabilitat de l'emplaçament de l'avantprojecte "Parc eòlic Tramuntana I", promogut per l'empresa ENERGIA EOLICA TRAMONTANA SOCIEDAD LIMITADA, als termes municipals d'Ascó i Flix (Ribera d'Ebre)". Generalitat de Catalunya. 2021-05-01. Archived from the original on 2024-02-19.
- ↑ https://web.archive.org/web/20240131154118/https://www.diarimes.com/es/ebre/200924/la-ponencia-ambiental-desestima-meitat-una-trentena-nous-parcs-eolics-projectats-ebre_77064.html. Archived from the original on 2024-01-31.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-22640.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 "BOE-B-2023-26213 Anuncio del Área Funcional de Industria y Energía de la Subdelegación del Gobierno en Tarragona por el que se somete a Información Pública la solicitud de Autorización Administrativa Previa y Declaración de Impacto Ambiental del proyecto PEol-764 que comprende el parque eólico Tramuntana de 112,2 MW". Boletín Oficial del Estado. 2023-09-13. Archived from the original on 2024-02-19. Retrieved 2024-02-02.
- ↑ 5.0 5.1 5.2 5.3 5.4 "Acord sobre la viabilitat de l'emplaçament de l'avantprojecte "Parc Eòlic Tramuntana 2", promogut per Abo Wind España, SA, als termes municipals de Flix, Riba-roja d'Ebre i Ascó". Generalitat de Catalunya. 2020-10-21. Archived from the original on 2024-02-19.
- ↑ https://www.diarimes.com/es/noticias/terres_l_ebre/2020/09/24/la_ponencia_ambiental_desestima_meitat_una_trentena_nous_parcs_eolics_projectats_ebre_89579_3024.html http://dtes.gencat.cat/portalAA/AppJava/document.do?codi=175e2fb7deda480aafa56607a19958d1, https://www.diarimes.com/es/noticias/terres_l_ebre/2020/09/24/la_ponencia_ambiental_desestima_meitat_una_trentena_nous_parcs_eolics_projectats_ebre_89579_3024.html.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 7.0 7.1 7.2 7.3 7.4 "Acord sobre la viabilitat de l'emplaçament de l'avantprojecte "Parc Eòlic Tramuntana 3"". Generalitat de Catalunya. 2020-10-21. Archived from the original on 2024-02-19.
- ↑ 8.0 8.1 8.2 (PDF) https://web.archive.org/web/20240131151707/https://directa.cat/app/uploads/2020/09/Directa-506.pdf. Archived from the original (PDF) on 2024-01-31.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 9.2 9.3 9.4 "Acord sobre la viabilitat de l'emplaçament de l'avantprojecte "Parc Eòlic Tramuntana 4"". Generalitat de Catalunya. 2020-11-18. Archived from the original on 2024-02-19.
- ↑ 10.0 10.1 10.2 10.3 10.4 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental de l'avantprojecte "Parc Eòlic Tramuntana 5"". Generalitat de Catalunya. 2020-11-18. Archived from the original on 2024-02-19.
