Tunghsiao power station
From Global Energy Monitor
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Tunghsiao power station (通霄發電廠, 通霄電廠更新擴建) is an operating power station of at least 3951-megawatts (MW) in Tongxiao, Miaoli, Taiwan with multiple units, some of which are not currently operating. It is also known as Tongxiao.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Tunghsiao power station | Tongxiao, Miaoli, Taiwan | 24.490013, 120.673505 (exact)[1][2][3] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 4, Unit 5, Unit 6, Unit Expansion 1, Unit New 1, Unit New 2, Unit New 3, Unit New 4, Unit New 5, Unit New 6, Unit New 7, Unit New 8: 24.490013, 120.673505
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 4 | operating[4] | fossil gas - LNG[5] | 386[4][6] | combined cycle[4][6] | – | 1997[4] | 2024 (planned)[7] |
Unit 5 | operating[4] | fossil gas - LNG[5] | 386[4][6] | combined cycle[4][6] | – | 1997[4] | 2024 (planned)[7] |
Unit 6 | operating[4] | fossil gas - LNG[5] | 320[4][6] | combined cycle[8][6] | – | 2000[8] | 2029 (planned)[9] |
Unit Expansion 1 | operating[10] | fossil gas - LNG[7] | 180[7] | gas turbine[10] | – | 2023[11] | – |
Unit New 1 | operating[12] | fossil gas - LNG[4] | 893[12] | combined cycle[12] | – | 2018[12] | – |
Unit New 2 | operating[12] | fossil gas - LNG[4] | 893[12] | combined cycle[12] | – | 2019[12] | – |
Unit New 3 | operating[12] | fossil gas - LNG[4] | 893[12] | combined cycle[12] | – | 2020[12] | – |
Unit New 4 | pre-permit[13] | fossil gas - LNG[14] | 650[15] | combined cycle[7] | – | 2030[16] | – |
Unit New 5 | pre-permit[13] | fossil gas - LNG[14] | 650[15] | combined cycle[7] | – | – | – |
Unit New 6 | pre-permit[13] | fossil gas - LNG[14] | 650[15] | combined cycle[7] | – | – | – |
Unit New 7 | pre-permit[13] | fossil gas - LNG[14] | 650[15] | combined cycle[7] | – | – | – |
Unit New 8 | pre-permit[13] | fossil gas - LNG[14] | 660[15] | combined cycle[7] | – | – | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Unit 4 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit 5 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit 6 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit Expansion 1 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit New 1 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit New 2 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit New 3 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit New 4 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit New 5 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit New 6 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit New 7 | Taiwan Power Co (TAIPOWER) [100.0%] |
Unit New 8 | Taiwan Power Co (TAIPOWER) [100.0%] |
Articles and Resources
References
- ↑ https://web.archive.org/web/20221203060854/https://www.taipower.com.tw/EN/page.aspx?mid=4508&cid=2942&cchk=8ff2aafa-9932-4a53-b5fb-2f55dfa9d103. Archived from the original on 03 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/Tunghsiao+Power+Plant/@24.490013120.6735054069m/data=!3m1!1e3!4m5!3m4!1s0x0:0x9a89334c8560d6bf!8m2!3d24.4907953!4d120.6742932.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://eiadoc.epa.gov.tw/EIAWEB/11.aspx?hcode=1090821A&srctype=0.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 https://web.archive.org/web/20221203060842/https://www.nsenergybusiness.com/projects/tung-hsiao-power-plant-renewal/. Archived from the original on 03 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20211020072635/https://www.offshore-energy.biz/ctci-scores-647-million-taichung-lng-terminal-contract/. Archived from the original on 20 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20230119045202/https://www.taipower.com.tw/tc/news_noclassify_info.aspx?id=2875&chk=22e934c6-2c88-40ba-9a61-934a7f23cedf&mid=334¶m=pn%3d1%26mid%3d334%26key%3d. Archived from the original on 19 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 https://web.archive.org/web/20220625195514/https://www.taipower.com.tw/tc/page.aspx?mid=212&cid=122&cchk=260a432c-fc0e-47e0-a90e-2bc0cc52cb61. Archived from the original on 25 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 (PDF) https://web.archive.org/web/20221203060839/https://library.e.abb.com/public/f1f9c9bb61f1ddfac1256ecc003a173a/47%20ENG%209704.pdf. Archived from the original (PDF) on 03 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230204130134/https://e-info.org.tw/node/227790. Archived from the original on 04 February 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 10.0 10.1 https://web.archive.org/web/20230616150337/https://tw.news.yahoo.com/%E5%A2%9E%E6%B0%A3%E6%B8%9B%E7%85%A4-%E9%80%9A%E9%9C%84%E9%9B%BB%E5%BB%A0%E4%BA%8C%E6%9C%9F%E8%A8%88%E7%95%AB%E9%A0%90%E8%A8%882030%E4%BD%B5%E8%81%AF%E7%99%BC%E9%9B%BB-112134600.html. Archived from the original on 16 June 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.taipower.com.tw/tc/page.aspx?mid=212&cid=122&cchk=260a432c-fc0e-47e0-a90e-2bc0cc52cb61 https://tw.news.yahoo.com/%E5%A2%9E%E6%B0%A3%E6%B8%9B%E7%85%A4-%E9%80%9A%E9%9C%84%E9%9B%BB%E5%BB%A0%E4%BA%8C%E6%9C%9F%E8%A8%88%E7%95%AB%E9%A0%90%E8%A8%882030%E4%BD%B5%E8%81%AF%E7%99%BC%E9%9B%BB-112134600.html https://www.taipower.com.tw/tc/page.aspx?mid=212&cid=122&cchk=260a432c-fc0e-47e0-a90e-2bc0cc52cb61.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 https://web.archive.org/web/20221112104515/https://www.taipower.com.tw/en/page.aspx?mid=4508. Archived from the original on 12 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 https://web.archive.org/web/20220903053015/https://www.taipower.com.tw/tc/topic/2021_tcpp/index.html. Archived from the original on 03 September 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 , https://eiadoc.epa.gov.tw/EIAWEB/11.aspx?hcode=1090821A&srctype=0 https://e-info.org.tw/node/227790 , https://eiadoc.epa.gov.tw/EIAWEB/11.aspx?hcode=1090821A&srctype=0.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 15.3 15.4 , https://e-info.org.tw/node/227790 https://www.taipower.com.tw/tc/page.aspx?mid=212&cid=122&cchk=260a432c-fc0e-47e0-a90e-2bc0cc52cb61 , https://e-info.org.tw/node/227790.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230621081754/https://www.cna.com.tw/news/ahel/202306160306.aspx. Archived from the original on 21 June 2023.
{{cite web}}
: Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.