Turnow-Preilack Solarpark
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Lieberose Solar Power Plant (Phase 1-1)
Turnow-Preilack Solarpark is an operating solar photovoltaic (PV) farm in Turnow-Preilack, Brandenburg, Germany.
Project Details
Table 1: Phase-level project details for Turnow-Preilack Solarpark
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1-1 | Operating[1] | 2009[1] | 51 MWp/dc[1] | PV[1] | Juwi Group [100%][2] |
2-Jan | Operating[1] | 2009[1] | 1.1 MWp/dc[1] | PV[1] | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Turnow-Preilack Solarpark
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1-1 | Turnow-Preilack, Brandenburg, Germany[1] | 51.8717, 14.3890 (exact)[1] |
2-Jan | Turnow-Preilack, Brandenburg, Germany[1] | 51.8717, 14.3890 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "Marktstammdatenregister (Market master data register)". Germany Federal Network Agency. 2023-02. Archived from the original on 2024-01-25. Retrieved 2023-02.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help) - ↑ https://web.archive.org/web/20210225184959/https://www.juwi.de/wind/betriebsfuehrung/referenzen. Archived from the original on 25 February 2021.
{{cite web}}
: Missing or empty|title=
(help)