Unnamed_South-Eastern Siberia power station (Забайскальская ТЭС, Забайкальская ГРЭС) is a power station in the pre-permit stage in Russia.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Unnamed_South-Eastern Siberia power station Russia 52.5868158214866, 116.58421115524644 (approximate)
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Pre-permit[1] coal: bituminous[1][2] 350[1] unknown 2031 (planned)[1] False
Unit 2 Pre-permit[1] coal: bituminous[1][2] 350[1] unknown 2031 (planned)[1] False
Unit 3 Pre-permit[1] coal: bituminous[1][2] 350[1] unknown 2031 (planned)[1] False

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
Unit 1 En+ Generatsiya[1] En+ Generatsiya JSC [100%][1] En+ Group PJSC [100.0%]
Unit 2 En+ Generatsiya[1] En+ Generatsiya JSC [100%][1] En+ Group PJSC [100.0%]
Unit 3 En+ Generatsiya[1] En+ Generatsiya JSC [100%][1] En+ Group PJSC [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

In January 2026, En+ Group announced that its subsidiary JSC En+ Generation had won a competitive capacity auction for new generating facilities held on December 29-30, 2025.[3] The company said it would build a new 1,050 MW thermal power plant to serve Zabaykalsky Krai and the Republic of Buryatia.[3]

According to the company, the plant would consist of three 350 MW units.[3] The first unit was planned to enter operation on July 1, 2031, and the plant was expected to reach its full installed capacity of 1,050 MW by December 1, 2031.[3]

The plant was referred to in press reports and company announcements as Zabaykalskaya TES (Забайкальская ТЭС) or Zabaykalskaya GRES. En+ registered a subsidiary, Zabaykalskaya GRES LLC, to manage electricity generation at the new facility.[4] Capital expenditure for the plant was estimated at over 400 billion rubles (approximately $5.4 billion at January 2026 exchange rates), though En+ initially disclosed a figure of over 300 billion rubles.[5]

The plant was expected to address a projected power deficit of up to 2,074 MW in the south-eastern part of the Siberian Unified Energy System by 2031.[6] The plant was planned to run on coal from the Zashulansky deposit in the Krasnochikoysky district of Zabaykalsky Krai, which is being developed by Razrezugol LLC, a joint venture between En+ and China's CHN Energy.[7] As of May 2026, two potential sites were under consideration: Krasnochikoysky district, close to the coal deposit, and Khiloksky district.[8]

Financing

The project was selected through Russia's competitive capacity auction for new generating facilities (KOM NGO), a mechanism that guarantees the winning developer elevated wholesale market capacity payments for 15 years following commissioning.[3]

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 https://enplusgroup.com/ru/media/news/press/strategicheskiy-proekt-en-dlya-zabaykalya-i-buryatii-postroyat-tes-moshchnostyu-1-gvt/. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 https://www.chita.ru/text/economics/2026/02/08/76254424/. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 Cite error: Invalid <ref> tag; no text was provided for refs named :1
  4. ↑ "Строительство Забайкальской ТЭС мощностью 1050 мегаватт могут начать в Хилокском округе". chita.ru. February 2026.{{cite web}}: CS1 maint: url-status (link)
  5. ↑ "Генерация вполцены". peretok.ru. January 2026.{{cite web}}: CS1 maint: url-status (link)
  6. ↑ "Стратегический проект Эн+: для Забайкалья и Бурятии построят ТЭС мощностью 1 ГВт". enplusgroup.com. January 2026.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "Строительство Забайкальской ТЭС мощностью 1050 мегаватт могут начать в Хилокском округе". chita.ru. February 2026.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "Красночикойский округ может стать одним из флагманов экономического развития Забайкалья". hilok.ru. May 2026.{{cite web}}: CS1 maint: url-status (link)