Vale De Moura solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Vale De Moura
Vale De Moura solar farm is an operating solar photovoltaic (PV) farm in Safara e Santo Aleixo da Restauração, Beja, Portugal.
Project Details
Table 1: Phase-level project details for Vale De Moura solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2019[1] | 29 MWp/dc[2] | PV[2] | Hyperion Renewables [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Vale De Moura solar farm
Location | Coordinates (WGS 84) |
---|---|
Safara e Santo Aleixo da Restauração, Beja, Portugal[3] | 38.5180, -7.8320 (exact)[3] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240206151124/https://www.pv-magazine.com/2020/10/30/unsubsidized-pv-plant-goes-online-in-portugal/. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240201215619/https://www.pv-magazine.com/2018/05/30/construction-begins-on-portugals-first-unsubsidized-solar-park/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://wiki-solar.org/ https://datasets.wri.org/dataset/globalpowerplantdatabase, https://wiki-solar.org/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)