Vandellós (Naturgy) wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Vandellós (Naturgy) wind farm (Parc eòlic Vandellòs (Naturgy)) is a cancelled wind farm in Vandellòs i l'Hospitalet de l'Infant, Baix Camp, Cataluña, Spain.
Project Details
Table 1: Phase-level project details for Vandellós (Naturgy) wind farm
Status | Nameplate capacity | Type | Owner |
---|---|---|---|
Cancelled (inferred February 2024) | 21 MW[1] | Onshore[1] | Naturgy Energy Group SA [100%][2] |
Location
Table 2: Phase-level location details for Vandellós (Naturgy) wind farm
Location | Coordinates (WGS 84) |
---|---|
Vandellòs i l'Hospitalet de l'Infant, Baix Camp, Cataluña, Spain[1] | 40.9988, 0.8497 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Acord sobre la viabilitat de l'emplaçament i pronunciament sobre l'amplitud i el nivell de detall de l'estudi d'impacte ambiental del projecte de parc eòlic Vandellòs, sol·licitat per Naturgy Renovables, SLU, als termes municipals de Vandellòs i l'Hospitalet de l'Infant, Tivissa, Ginestar, Mora la Nova i Garcia (Baix Camp i Ribera d'Ebre)". Generalitat de Catalunya. 2020-03-13. Archived from the original on 2024-02-19.
- ↑ http://infoanoia.cat/nous-projectes-parcs-eolics-preveu-vintena-nous-molins-lanoia/ https://dtes.gencat.cat/portalAA/AppJava/document.do?codi=f49dbeb01b6e4b9e8e08e8206f2d3c85, http://infoanoia.cat/nous-projectes-parcs-eolics-preveu-vintena-nous-molins-lanoia/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)