Virginia Peak wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Virginia Peak wind farm is a cancelled wind farm in Sparks, Washoe County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Virginia Peak wind farm
Phase name | Status | Nameplate capacity | Type | Owner |
---|---|---|---|---|
1 | Cancelled (inferred November 2021) | 90 MW[1] | Onshore[1] | Nevada Wind Co [100%][2] |
Location
Table 2: Phase-level location details for Virginia Peak wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Sparks, Washoe County, Nevada, United States[1] | 39.5571, -119.7070 (approximate)[1] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 (PDF) https://web.archive.org/web/20161107184813/http://www.unlv.edu/sites/default/files/24/windPowerInNevada.pdf. Archived from the original (PDF) on 07 November 2016.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131104738/https://lasvegassun.com/news/2009/feb/20/las-vegas-company-plans-northern-nevada-wind-farm/. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)