Viridis Eolia Master Plan wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Little Medicine Bow wind farm (Phase 1)
Viridis Eolia Master Plan wind farm is a shelved wind farm in Carbon County, Wyoming, United States.
Project Details
Table 1: Phase-level project details for Viridis Eolia Master Plan wind farm
Phase name | Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
1 | Shelved (inferred August 2024) | 32 MW[1] | Onshore[1] | Viridis Eolia LLC [100%][1] | Viridis Eolia[2] |
2 | Shelved (inferred August 2024) | 230 MW[1] | Onshore[3] | Viridis Eolia LLC [100%][3] | Viridis Eolia[2] |
3 | Shelved (inferred August 2024) | 230 MW[1] | Onshore[3] | Viridis Eolia LLC [100%][3] | Viridis Eolia[2] |
4 | Shelved (inferred August 2024) | 230 MW[1] | Onshore[3] | Viridis Eolia LLC [100%][3] | Viridis Eolia[2] |
5 | Shelved (inferred August 2024) | 230 MW[1] | Onshore[3] | Viridis Eolia LLC [100%][3] | Viridis Eolia[2] |
6 | Shelved (inferred August 2024) | 230 MW[1] | Onshore[3] | Viridis Eolia LLC [100%][3] | Viridis Eolia[2] |
7 | Shelved (inferred August 2024) | 230 MW[1] | Onshore[3] | Viridis Eolia LLC [100%][3] | Viridis Eolia[2] |
8 | Shelved (inferred August 2024) | 230 MW[1] | Onshore[3] | Viridis Eolia LLC [100%][3] | Viridis Eolia[2] |
9 | Shelved (inferred August 2024) | 230 MW[1] | Onshore[3] | Viridis Eolia LLC [100%][3] | Viridis Eolia[2] |
Location
Table 2: Phase-level location details for Viridis Eolia Master Plan wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Carbon County, Wyoming, United States[1] | 41.2070, -106.7920 (approximate)[1] |
2 | Carbon County, Wyoming, United States[3] | 41.2070, -106.7920 (approximate)[3] |
3 | Carbon County, Wyoming, United States[3] | 41.2070, -106.7920 (approximate)[3] |
4 | Carbon County, Wyoming, United States[3] | 41.2070, -106.7920 (approximate)[3] |
5 | Carbon County, Wyoming, United States[3] | 41.2070, -106.7920 (approximate)[3] |
6 | Carbon County, Wyoming, United States[3] | 41.2070, -106.7920 (approximate)[3] |
7 | Carbon County, Wyoming, United States[3] | 41.2070, -106.7920 (approximate)[3] |
8 | Carbon County, Wyoming, United States[3] | 41.2070, -106.7920 (approximate)[3] |
9 | Carbon County, Wyoming, United States[3] | 41.2070, -106.7920 (approximate)[3] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://web.archive.org/web/20211106032832/https://www.power-eng.com/news/goldwind-americas-to-provide-1-870-mw-of-wind-turbines-to-viridis-eolia/. Archived from the original on 06 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20240131033239/https://www.tdworld.com/. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 (PDF) https://web.archive.org/web/20240126081708/https://wyoleg.gov/InterimCommittee/2016/03-0922APPENDIX14.pdf. Archived from the original (PDF) on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help)