Visonta Coal Mine is an operating coal mine in Visonta, Heves, Hungary.
Location
Table 1: Project-level location details
| Mine Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Visonta Coal Mine | Visonta, Heves, Hungary | 47.747895, 20.055917 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
| Status | Status Detail | Opening Year | Closing Year |
|---|---|---|---|
| Operating | – | 1964[1] | 2027 (planned)[2][3] |
Table 3: Operation details
| Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
|---|---|---|---|---|---|---|---|
| – | 1.7[4][5] | 2024[4][5] | Surface[1] | Open Pit | – | 80 | 749.5021438052992[2] |
Table 4: Coal resources and destination
| Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
|---|---|---|---|---|---|---|
| – | 2022[6] | 2150 | – | Lignite[6] | Thermal[6] | Coal Plant |
Table 5: Ownership and parent company
| Owner | Parent Company | Headquarters |
|---|---|---|
| Mátrai Erömü Zrt (MÁTRA) [100.0%][1] | RWE Power [33%]; Magyar Villamos Müvek Zrt [33%]; ENBW Trust [33%] | Germany |
Table 6: Historical production (unit: million tonnes per annum)
| ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|---|---|---|---|---|
| Saleable | – | 3.9*[7] | 3.4*[8] | 3.05*[8] | 2.5*[9] | 2.44*[10][11] | 2*[4][12] | 1.7[4][5] | – |
Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Visonta and Bükkábrány mines are operated by Mátrai Erömü Zrt (MÁTRA) in Visonta, Heves, Hungary.[13]
The two mines provide coal to the Matra power station. The Visonta mine is adjacent to the Bükkábrány mine. Production is reported in total for MATRA and is assumed to come in equal parts from the two mines.
Surface mining activity of Visonta started in 1964 with opening the mining pit K-I, which was followed by exploiting the Western mine, then the mine K-II. In the Southern mine overburden production was completed at the end of 2020, coal excavation was completed in the first quarter of 2020. As a continuation of the mining field K-II (Eastern), excavation of the mine Eastern-III (K-III) began on 8 September 2015. The coal from the mine K-III is transported to the power plant on a conveyor line of 11.8 km length.[14]
The two approved mining fields of MÁTRA's opencast operations held approximately 770 million tonnes of lignite reserves, according to Euracoal.[15] The CEO of MVM Mátra Energia stated at a conference in January 2025 that the mines contained enough coal reserves for one hundred years, and that mining equipment could continue operating for another thirty years with continuous modernisation.[16]
Production
In 2022, MÁTRA produced 4.9 million tonnes of lignite.[17] In 2023, combined output from the two mines totalled 4.1 million tonnes of lignite.[18]
Coal Phase-Out
On July 2020, the company unveiled plans to build a 500 MW gas-fired unit at its facility in Visonta (80 kilometers northeast of Budapest), as well as 440 MW solar parks at its mines.[19] In November 2023, the government of Hungary reportedly stated that the decommissioning of Matra power station would be delayed until the 650 MW gas-fired replacement project was brought online. The gas plant was expected to begin operating in 2027.[20] This was despite Hungary's 2021 commitment to phase out coal by 2025.[21]
In January 2025, MVM (Magyar Villamos Művek), Hungary's state-owned energy company, closed the tender for a 500–650 MW CCGT replacement plant at the Mátra site; the contract was awarded to a consortium of Status KPRIA, Elsewedy Electric and West Hungária Bau.[22] Construction began in September 2025, with completion scheduled for 2028.[23] Lignite-fired units at Mátra, and by extension the Visonta and Bükkábrány mines, were therefore expected to remain in operation until the end of 2028.[24]
Post-mining Lignite Use
A January 2025 conference in Bükkábrány, jointly organised by the local municipality, the University of Miskolc, and MVM Mátra Energia, examined alternative uses for lignite after energy production ceases. Presentations focused on extracting humic acid from lignite powder for use as an agricultural soil conditioner. The CEO of MVM Mátra Energia indicated the company aimed to sustain extraction of approximately one million tonnes per year of lignite for non-energy purposes over the long term, with a target of reaching 100,000 tonnes of processed product within two to three years. The University of Miskolc was reported to be preparing plans for producing charred lignite (pyrogenic carbon) within the company's existing infrastructure. Hungarian Agriculture Minister Nagy István attended the event and described lignite-based soil products as an innovative tool supporting the sustainability of Hungarian agriculture.[25]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://mert.mvm.hu/en/Rolunk/Tevekenyseg/Technologia.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://web.archive.org/web/20260527011453/https://op.europa.eu/o/opportal-service/download-handler?identifier=a7ac5979-7700-11ef-bbbe-01aa75ed71a1&format=PDF&language=en&productionSystem=cellar. Archived from the original on 27 May 2026.
{{cite web}}: Missing or empty|title=(help) - ↑ "European countries delay coal phase-outs and gamble on fossil gas amidst push for decarbonised power". 2023-12-07. Archived from the original on 2024-02-18. Retrieved 2024-01-19.
- ↑ 4.0 4.1 4.2 4.3 https://www.ceicdata.com/en/indicator/hungary/coal-production.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 (PDF) https://public.euracoal.eu/download/Public-Archive/Library/Charts-Maps/Coal-in-Europe/EURACOAL-Coal-in-Europe-2024-02.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 https://euracoal.eu/info/country-profiles/hungary-8/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20210729002719/https://euracoal.eu/info/country-profiles/hungary/.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 (PDF) https://public.euracoal.eu/download/Public-Archive/Library/Market-Reports/EURACOAL-Market-Report-2021-1_v04-kjd.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://en.wikipedia.org/wiki/M%C3%A1tra_Power_Plant.
{{cite web}}: Missing or empty|title=(help) - ↑ https://mert.mvm.hu/Rolunk/Tevekenyseg.
{{cite web}}: Missing or empty|title=(help) - ↑ https://euracoal.eu/info/country-profiles/hungary-8/#:~:text=Hungary's%20lignite%20and%20brown%20coal;output%20was%204.9%20million%20tonnes.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://public.euracoal.eu/download/Public-Archive/Library/Charts-Maps/Coal-in-Europe/EURACOAL-Coal-in-Europe-2023-02.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ Mátrai Erömü Zrt (MÁTRA),Our Business, Company Website, accessed September 20, 2020
- ↑ "Mining technology". mert.mvm.hu. Retrieved February 2025.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "Hungary". euracoal.eu. Retrieved March 13, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Kiborítanák a földekre a bükkábrányi lignitet". boon.hu. January 8, 2025. Retrieved March 13, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Hungary". euracoal.eu. Retrieved March 13, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "MVM Mátra Energy Co". igazsagosatmenet.eu. Retrieved March 13, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ Hungary: Electricity producer Matrai Eromu to build gas-fired unit and solar parks, Serbia Energy EU Energy News, accessed Septemeber 2020
- ↑ Cite error: Invalid
<ref>tag; no text was provided for refs named:0 - ↑ "Hungary," Powering Past Coal Alliance, accessed January 19, 2024
- ↑ "Hungary closes tender for a 500-650 MW CCGT power project in Matra". enerdata.net. January 28, 2025. Retrieved March 13, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Hungary: MVM launches construction of 540 MW gas-fired power plant in Matra region". serbia-energy.eu. September 10, 2025. Retrieved March 13, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "MVM Mátra Energy Co". igazsagosatmenet.eu. Retrieved March 13, 2026.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Kiborítanák a földekre a bükkábrányi lignitet". boon.hu. January 8, 2025. Retrieved March 13, 2026.
{{cite web}}: CS1 maint: url-status (link)