Volateo solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Volateo solar farm (Planta fotovoltaica Volateo Solar) is a solar photovoltaic (PV) farm in pre-construction in Antequera, Málaga, Andalucía, Spain.
Project Details
Table 1: Phase-level project details for Volateo solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 139 MWac[2] | PV[3] | Ignis Energía SL [100%][3] | Volateo Solar[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Volateo solar farm
Location | Coordinates (WGS 84) |
---|---|
Antequera, Málaga, Andalucía, Spain[2] | 37.0687, -4.6131 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11177, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2595 https://www.energiaestrategica.com/fervor-solar-en-espana-solo-los-proyectos-presentados-este-ano-duplicarian-a-toda-potencia-la-instalada/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11177, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2595.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 "BOE-A-2023-11177 Resolución de 20 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Volateo Solar, SL, autorización administrativa previa para la instalación fotovoltaica "PFV Volateo Solar", de 139,04 MW de potencia instalada, en Antequera, Campillos, Valle de Abdalajís y Álora (Málaga)". Boletín Oficial del Estado. 2023-05-11. Archived from the original on 2024-03-22. Retrieved 2024-03-21.
- ↑ 3.0 3.1 "Fervor solar en España: sólo los proyectos presentados este año duplicarían a toda potencia la instalada". Energía Estratégica España. 2022-05-31. Archived from the original on 2024-02-01.