Volateo solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Volateo solar farm (Planta fotovoltaica Volateo Solar) is a solar photovoltaic (PV) farm in pre-construction in Antequera, Málaga, Andalucía, Spain.

Project Details

Table 1: Phase-level project details for Volateo solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 139 MWac[2] PV[3] Ignis Energía SL [100%][3] Volateo Solar[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Volateo solar farm

Location Coordinates (WGS 84)
Antequera, Málaga, Andalucía, Spain[2] 37.0687, -4.6131 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11177, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2595 https://www.energiaestrategica.com/fervor-solar-en-espana-solo-los-proyectos-presentados-este-ano-duplicarian-a-toda-potencia-la-instalada/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11177, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-2595. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 "BOE-A-2023-11177 Resolución de 20 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Volateo Solar, SL, autorización administrativa previa para la instalación fotovoltaica "PFV Volateo Solar", de 139,04 MW de potencia instalada, en Antequera, Campillos, Valle de Abdalajís y Álora (Málaga)". Boletín Oficial del Estado. 2023-05-11. Archived from the original on 2024-03-22. Retrieved 2024-03-21.
  3. 3.0 3.1 "Fervor solar en España: sólo los proyectos presentados este año duplicarían a toda potencia la instalada". Energía Estratégica España. 2022-05-31. Archived from the original on 2024-02-01.