This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
|
Sub-articles:
|
|
Vologda-20-Vytegra Gas Pipeline (Russian: Газопровод-отвод от ГРС Вологда-20 к городам Кириллов, Белозерск, Липин Бор, Вытегра Вологодской области) is a proposed gas pipeline in Russia.[1]
The pipeline would consist of three segments: Stage I: Vologda-20-Kirillov Gas Pipeline (Russian: 1 этап. Газопровод-отвод от 0 км до ГРС «Кириллов»), Stage II: Kirillov-Lipin Bor Gas Pipeline (Russian: 2 этап. Газопровод-отвод от ГРС «Кириллов» до ГРС «Липин Бор»), and Stage III: Lipin Bor-Vytegra Gas Pipeline (Russian: 3 этап. Газопровод-отвод от ГРС «Липин Бор» до ГРС «Вытегра). Stage IV: Vytegra-Pudozh Gas Pipeline is not on the Gazprom 2021-2025 plan.
Location
Stage I: Vologda-20-Kirillov Gas Pipeline
The pipeline is proposed to run from Vologda-20 gas distribution station, near Chyobsara, Vologda Oblast to Kirillov, Vologda Oblast, Russia.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":59.54594217699802,"lon":38.588381988228626,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":59.15646,"lon":38.71901},{"lat":59.17196,"lon":38.74475},{"lat":59.17988,"lon":38.65552},{"lat":59.18603,"lon":38.62807},{"lat":59.18339,"lon":38.58002},{"lat":59.17988,"lon":38.54913},{"lat":59.18427,"lon":38.52854},{"lat":59.21503,"lon":38.58688},{"lat":59.23083,"lon":38.60061},{"lat":59.24136,"lon":38.60061},{"lat":59.24487,"lon":38.6212},{"lat":59.25014,"lon":38.64351},{"lat":59.25365,"lon":38.67268},{"lat":59.26505,"lon":38.67783},{"lat":59.28609,"lon":38.75504},{"lat":59.32551,"lon":38.75333},{"lat":59.40071,"lon":38.78765},{"lat":59.41904,"lon":38.81853},{"lat":59.44959,"lon":38.83226},{"lat":59.47313,"lon":38.80995},{"lat":59.58103,"lon":38.88889},{"lat":59.60535,"lon":38.87344},{"lat":59.66087,"lon":38.91806},{"lat":59.73273,"lon":38.91291},{"lat":59.76472,"lon":38.84427},{"lat":59.76385,"lon":38.79966},{"lat":59.77422,"lon":38.71386},{"lat":59.82946,"lon":38.66067},{"lat":59.86394,"lon":38.64179},{"lat":59.86135,"lon":38.58688},{"lat":59.88461,"lon":38.56114},{"lat":59.8803,"lon":38.50109},{"lat":59.88202,"lon":38.417},{"lat":59.85791,"lon":38.38269}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Stage II: Kirillov-Lipin Bor Gas Pipeline
The pipeline is proposed to run from Kirillov, Vologda Oblast to Lipin Bor, Vologda Oblast, Russia.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":60.050752641828865,"lon":38.211065761430625,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":59.86507,"lon":38.38529},{"lat":59.88856,"lon":38.40893},{"lat":59.89098,"lon":38.42534},{"lat":59.92558,"lon":38.41086},{"lat":59.9384,"lon":38.3544},{"lat":59.94009,"lon":38.3129},{"lat":59.96643,"lon":38.27139},{"lat":60.04653,"lon":38.27766},{"lat":60.07567,"lon":38.2574},{"lat":60.12042,"lon":38.28539},{"lat":60.16559,"lon":38.23037},{"lat":60.26113,"lon":37.97821}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":8,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Stage III: Lipin Bor-Vytegra Gas Pipeline
The pipeline is proposed to run from Lipin Bor, Vologda Oblast to Vytegra, Vologda Oblast, Russia.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":60.59829175846243,"lon":37.20537225421649,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":60.26113,"lon":37.97821},{"lat":60.28865,"lon":37.98062},{"lat":60.32654,"lon":37.92753},{"lat":60.34708,"lon":37.84259},{"lat":60.38765,"lon":37.78516},{"lat":60.49312,"lon":37.76586},{"lat":60.50785,"lon":37.74366},{"lat":60.59185,"lon":37.36626},{"lat":60.63306,"lon":37.11048},{"lat":60.75448,"lon":36.99851},{"lat":60.7837,"lon":36.94736},{"lat":60.83595,"lon":36.89427},{"lat":60.86158,"lon":36.80643},{"lat":60.89211,"lon":36.75142},{"lat":60.91089,"lon":36.69254},{"lat":61.01653,"lon":36.54679},{"lat":61.01583,"lon":36.44737}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Stage IV: Vytegra-Pudozh Gas Pipeline
The pipeline is proposed to run from Vytegra, Vologda Oblast, Russia to Krasnoborsky, Pudozhsky District, Republic of Karelia, Russia.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":61.34906,"lon":36.66675,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":61.0157,"lon":36.4446},{"lat":61.02253,"lon":36.53255},{"lat":61.11341,"lon":36.53473},{"lat":61.20979,"lon":36.62485},{"lat":61.22181,"lon":36.67046},{"lat":61.3668,"lon":36.67263},{"lat":61.58665,"lon":36.61942},{"lat":61.62306,"lon":36.58305},{"lat":61.68338,"lon":36.54558},{"lat":61.70912,"lon":36.54178},{"lat":61.75772,"lon":36.50486},{"lat":61.80906,"lon":36.49292}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
Project details
Stage I: Vologda-20-Kirillov Gas Pipeline
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.743 bcm/year[2]
- Length: 123.1 km[3]
- Diameter: 200 mm, 250 mm, 500 mm[3]
- Status: Proposed[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Stage II: Kirillov-Lipin Bor Gas Pipeline
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.743 bcm/year[2]
- Length: 55.5 km[3]
- Diameter: 100 mm, 500 mm[3]
- Status: Proposed[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Stage III: Lipin Bor-Vytegra Gas Pipeline
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.743 bcm/year[2]
- Length: 130.7 km[3]
- Diameter: 200 mm, 500 mm[3]
- Status: Proposed[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Vytegra-Pudozh Gas Pipeline
Stage IV: Vytegra-Pudozh Gas Pipeline
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.743 bcm/year[2]
- Length: 106.4 km[3]
- Diameter: 500 mm[3]
- Status: Proposed
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline was included in the gasification program of Gazprom for 2021-2025 for Vologda Oblast.[1] Stage IV is not included in the program, presumably due to the planned dates for stage IV not falling into the period of 2021-2025.
Articles and resources
References