Vologda-20-Vytegra Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Vologda-20-Vytegra Gas Pipeline (Russian: Газопровод-отвод от ГРС Вологда-20 к городам Кириллов, Белозерск, Липин Бор, Вытегра Вологодской области) is a proposed gas pipeline in Russia.[1]

The pipeline would consist of three segments: Stage I: Vologda-20-Kirillov Gas Pipeline (Russian: 1 этап. Газопровод-отвод от 0 км до ГРС «Кириллов»), Stage II: Kirillov-Lipin Bor Gas Pipeline (Russian: 2 этап. Газопровод-отвод от ГРС «Кириллов» до ГРС «Липин Бор»), and Stage III: Lipin Bor-Vytegra Gas Pipeline (Russian: 3 этап. Газопровод-отвод от ГРС «Липин Бор» до ГРС «Вытегра). Stage IV: Vytegra-Pudozh Gas Pipeline is not on the Gazprom 2021-2025 plan.

Location

Stage I: Vologda-20-Kirillov Gas Pipeline

The pipeline is proposed to run from Vologda-20 gas distribution station, near Chyobsara, Vologda Oblast to Kirillov, Vologda Oblast, Russia.

Loading map...

Stage II: Kirillov-Lipin Bor Gas Pipeline

The pipeline is proposed to run from Kirillov, Vologda Oblast to Lipin Bor, Vologda Oblast, Russia.

Loading map...

Stage III: Lipin Bor-Vytegra Gas Pipeline

The pipeline is proposed to run from Lipin Bor, Vologda Oblast to Vytegra, Vologda Oblast, Russia.

Loading map...

Stage IV: Vytegra-Pudozh Gas Pipeline

The pipeline is proposed to run from Vytegra, Vologda Oblast, Russia to Krasnoborsky, Pudozhsky District, Republic of Karelia, Russia.

Loading map...

Project details

Stage I: Vologda-20-Kirillov Gas Pipeline

  • Operator:
  • Owner: Gazprom[1]
  • Parent company: Gazprom
  • Capacity: 0.743 bcm/year[2]
  • Length: 123.1 km[3]
  • Diameter: 200 mm, 250 mm, 500 mm[3]
  • Status: Proposed[1]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Stage II: Kirillov-Lipin Bor Gas Pipeline

  • Operator:
  • Owner: Gazprom[1]
  • Parent company: Gazprom
  • Capacity: 0.743 bcm/year[2]
  • Length: 55.5 km[3]
  • Diameter: 100 mm, 500 mm[3]
  • Status: Proposed[1]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Stage III: Lipin Bor-Vytegra Gas Pipeline

  • Operator:
  • Owner: Gazprom[1]
  • Parent company: Gazprom
  • Capacity: 0.743 bcm/year[2]
  • Length: 130.7 km[3]
  • Diameter: 200 mm, 500 mm[3]
  • Status: Proposed[1]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure: Vytegra-Pudozh Gas Pipeline

Stage IV: Vytegra-Pudozh Gas Pipeline

  • Operator:
  • Owner: Gazprom[1]
  • Parent company: Gazprom
  • Capacity: 0.743 bcm/year[2]
  • Length: 106.4 km[3]
  • Diameter: 500 mm[3]
  • Status: Proposed
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline was included in the gasification program of Gazprom for 2021-2025 for Vologda Oblast.[1] Stage IV is not included in the program, presumably due to the planned dates for stage IV not falling into the period of 2021-2025.

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "Программа газификации 2021–2025 в Вологодской области". Gazprommap.ru. 2022. Retrieved Jul 26, 2022.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 "https://tass.ru/vologodskaya-oblast/3605150?utm_source=google.com&utm_medium=organic&utm_campaign=google.com&utm_referrer=google.com". tass.ru. Retrieved 2022-08-08. {{cite web}}: External link in |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "Газопровод-отвод и ГРС к городам Кириллов-Белозерск-Липин Бор-Вытегра Вологодской области. Том 1". Администрация муниципального образования города Кириллов. Retrieved 2022-08-08.{{cite web}}: CS1 maint: url-status (link)