The pipeline is proposed to run from Sheksna, Vologda Oblast to Cherepovets, Vologda Oblast, Russia (specifically, the pipeline would end at Cherepovets-2 gas distribution station). It is also possible that the pipeline would instead start at Vologda-20 gas distribution station, near Chyobsara, Vologda Oblast.
Loading map...
{"type":"ROADMAP","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"400px","height":"300px","centre":{"text":"","title":"","link":"","lat":59.23965985583768,"lon":38.27976435690651,"icon":""},"title":"","label":"","icon":"","lines":[{"text":"","title":"","link":"","strokeColor":"#FF0000","strokeOpacity":"1","strokeWeight":"2","pos":[{"lat":59.15714,"lon":38.7271},{"lat":59.15993,"lon":38.64349},{"lat":59.16549,"lon":38.6196},{"lat":59.16661,"lon":38.56096},{"lat":59.1616,"lon":38.54576},{"lat":59.1616,"lon":38.52513},{"lat":59.18163,"lon":38.47843},{"lat":59.18441,"lon":38.40894},{"lat":59.2733,"lon":38.27646},{"lat":59.30435,"lon":38.16027},{"lat":59.29493,"lon":38.08535},{"lat":59.25443,"lon":38.02346},{"lat":59.20276,"lon":38.00065},{"lat":59.16327,"lon":38.00391},{"lat":59.15937,"lon":37.91595},{"lat":59.14099,"lon":37.9127}]}],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"visitedicon":"","wmsoverlay":false,"zoom":7,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"cluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","fullscreen":false,"scrollwheelzoom":false,"locations":[]}
The pipeline was included in the gasification program of Gazprom for 2021-2025 for Vologda Oblast.[1]