Waco Solar II

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Waco Solar II is an announced solar photovoltaic (PV) farm in Limestone County, Texas, United States.

Project Details

Table 1: Phase-level project details for Waco Solar II

Phase name Status Commissioning year Nameplate capacity Technology
5698 Announced[1] 2027 (planned)[1] 190 MWac[1] PV[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Waco Solar II

Phase Name Location Coordinates (WGS 84)
5698 Limestone County, Texas, United States[1] 31.7106, -96.7914 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.