Wadi Ad Dawasir Solar PV Plant
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Wadi Ad Dawasir Solar PV Plant (محطة وادي الدواسر للطاقة الشمسية) is a solar photovoltaic (PV) farm under construction in Wadi Ad Dawasir, Najd, Saudi Arabia.
Project Details
Table 1: Phase-level project details for Wadi Ad Dawasir Solar PV Plant
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2025 (planned)[2] | 120 MW[1] | PV[3] | Altaaqa Renewables[4][5] | Altaaqa Renewables[4][5] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Wadi Ad Dawasir Solar PV Plant
Location | Coordinates (WGS 84) |
---|---|
Wadi Ad Dawasir, Najd, Saudi Arabia[1][6] | 20.5595, 44.8657 (approximate)[7] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://www.pv-magazine.com/2021/10/18/lowest-shortlisted-bid-in-saudi-third-pv-tender-was-0-0148-kwh/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.saudigulfprojects.com/2023/07/toyota-tsusho-announces-the-details-of-119mw-wadi-ad-dawasir-solar-pv-ipp-in-saudi-arabia/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.dmsprojects.net/saudi-arabia/projects/repdo-pif-wadi-al-dawasir-70-mw-pv-plant/PRJ00026581.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.pv-tech.org/altaaqa-reaches-financial-close-for-119mwp-wadi-al-dawasir-solar-plant/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://attaqa.net/2023/06/28/%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D9%81%D9%8A-%D8%A7%D9%84%D8%B3%D8%B9%D9%88%D8%AF%D9%8A%D8%A9-%D8%AA%D8%B3%D8%AA%D9%82%D8%B7%D8%A8-%D8%A7%D8%B3%D8%AA/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://energy-utilities.com/saudi-arabia-postpones-bid-deadline-for-solar-news111512.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.latlong.net/place/wadi-ad-dawasir-najd-saudi-arabia-25457.html.
{{cite web}}
: Missing or empty|title=
(help)