Wanli No.1 Coal Mine

From Global Energy Monitor

Wanli No.1 Coal Mine (中国神华能源股份有限公司万利一矿) is located in Wanli Town, Dongsheng District, Ordos City, Inner Mongolia, China, with a production capacity of 10 million tons per year.

Location

The undated satellite photo below shows the coal mine located in Wanli Town, Dongsheng District, Ordos City, Inner Mongolia, China

Loading map...

Coal Mine Background

The Wanli No.1 Coal Mine is operated by China Shenhua Energy Co., Ltd. It is from the expansion and integration technology of the original Wanli No. 1 Well, Wanli No. 2 Well, Changhan Gou Well, Hanjiacun Well, Qiaojiaqu Well, Tianmanliang No. 1 Well, and Tianmanliang No. 2 Well.The construction started on July 1, 2005, and completed in October 2007. It has an approved production capacity of 10 million tons per year.[1]

Project Details

  • Sponsor: Shenhua Energy Holding Co., Ltd
  • Parent Company: National Energy Investment Group(69.45%), HKSCC NOMINEES LIMITED(17.05%), Others(13.5%)
  • Location: Wanli Town, Dongsheng District, Ordos City, Inner Mongolia.
  • GPS Coordinates: 39.899571, 109.917382(exact)
  • Status: Operating
  • Production Capacity: 10Mt/Year[2]
  • Total Resource:1530Mt[3]
  • Minable Reserves: 519.803Mt
  • Coal Type: bituminous (long flame coal, non-caking coal)[2]
  • Mine Size: 91.3687k㎡[4]
  • Mine Type: Underground
  • Start Year:2009
  • Source of Financing:

Articles and resources

References

  1. "中国神华能源股份有限公司万利一矿安全现状评价报告"中检集团公信安全科技有限公司网,Accessed October 21, 2020
  2. 2.0 2.1 "中国神华证券报告"中泰证券, October 24, 2018
  3. "万利一矿迎接检查汇报材料"百度文库, December 2014
  4. "关于中国神华能源股份有限公司神东煤炭分公司万利一矿增加生产能力5.0Mt/a建设项目环境影响后评价报告书的批复"内蒙古自治区环境保护厅文件内环审{2015}49号, February 06, 2015

Related GEM.wiki articles