Wanxiang Nickel Indonesia power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Wanxiang Nickel Indonesia power station is an operating power station of at least 130-megawatts (MW) in Bahomotefe, Central Bungku, Morowali Regency, Sulawesi, Indonesia with multiple units, some of which are not currently operating. It is also known as 万向镍业印尼镍业自备电厂.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Wanxiang Nickel Indonesia power station | Bahomotefe, Central Bungku, Morowali Regency, Sulawesi, Indonesia | -2.730952, 122.030621 (exact) |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 1, Phase II Unit 2: -2.730952, 122.030621
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: unknown[1] | 65 | unknown | 2022 | False |
| Phase I Unit 2 | Operating | coal: unknown[1] | 65 | unknown | 2022 | False |
| Phase II Unit 1 | Pre-permit | coal: unknown[2][1] | 200[2] | unknown | – | False |
| Phase II Unit 2 | Pre-permit | coal: unknown[2][1] | 200[2] | unknown | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | PT Wanxiang Steel Indonesia [100%] | PT Wanxiang Steel Indonesia [100.0%] |
| Phase I Unit 2 | PT Wanxiang Steel Indonesia [100%] | PT Wanxiang Steel Indonesia [100.0%] |
| Phase II Unit 1 | PT Wanxiang Steel Indonesia [100%] | PT Wanxiang Steel Indonesia [100.0%] |
| Phase II Unit 2 | PT Wanxiang Steel Indonesia [100%] | PT Wanxiang Steel Indonesia [100.0%] |
Project-level captive use details
- Captive industry: Nickel
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Construction of the plant, which would power the PT Wanxiang nickel smelter, began in October 2020.[3]
In August 2022, Unit 1 became operational. In October 2022, Unit 2 became operational.[4]
As of at least September 2024, Wanxiang Nickel Indonesia planned to expand its operations in Bahomotefe.[5] The expansion would reportedly include two 200 MW coal units.[6]
As of April 2026, no Phase II physical construction progress was visible on Planet imagery.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://wanxiang.co.id/about-wanxiang/.
{{cite web}}: Missing or empty|title=(help) - ↑ 万向镍业印尼一期电厂项目安装工程开工, Oct. 15, 2020
- ↑ 万向镍业二号机组成功发电并网,RKEF应急演练, Wanxiang Nickel Industry Co., Oct. 13, 2022
- ↑ Xiamen International, Wanxiang Nickel deepen global energy chain cooperation, Petromindo, April 3, 2025
- ↑ About Wanxiang, PT Wanxiang Nickel Indonesia, accessed April 7, 2026
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.