Weihe power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Weihe power station (贵阳能源威赫煤电气一体化发电厂) is a power station under construction in Caishen Town Xiaohai Village, Hezhang County, Bijie, Guizhou, China. It is also known as 贵州赫章县威赫2×660MW超超临界CFB燃用高硫无烟煤发电示范项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Weihe power station Caishen Town Xiaohai Village, Hezhang County, Bijie, Guizhou, China 27.2196455, 104.648633 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 27.2196455, 104.648633

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 Construction coal: anthracite 660 ultra-supercritical 2025 (planned)
Unit 2 Construction coal: anthracite 660 ultra-supercritical 2025 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Hezhang Electric Power Co Ltd of Guiyang Energy Group [100%] Shenzhen Huidayu Technology Co Ltd [34.0%]; TCL Holdings (BVI) Ltd [19.1%]; Guizhou Hezong Boyuan Energy Technology Co Ltd [16.8%]; Guizhou Qunfa Energy Investment Co Ltd [15.0%]; Guiyang Jucong Technology Center LP [12.0%]; unknown [3.1%]
Unit 2 Hezhang Electric Power Co Ltd of Guiyang Energy Group [100%] Shenzhen Huidayu Technology Co Ltd [34.0%]; TCL Holdings (BVI) Ltd [19.1%]; Guizhou Hezong Boyuan Energy Technology Co Ltd [16.8%]; Guizhou Qunfa Energy Investment Co Ltd [15.0%]; Guiyang Jucong Technology Center LP [12.0%]; unknown [3.1%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Project

Guiyang Energy Group has proposed a coal-fired power station of two 660 MW supercritical units for Hezhang County.[1] It was seeking environmental clearance in 2014.[2]

The project remained in limbo until 2019, when it was revived as a "national demonstration project" for burning high sulphur anthracite coal. One unit will be built first, with construction of the second unit dependent on the success of the first unit. The pre-feasibility study was approved in February 2019.[3]

Unit 1 was permitted in August 2019.[4] Unit 2 was permitted in December 2019.[5]

Construction began in October 2020.[6]