Wenzhou Huagang LNG Terminal
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Wenzhou Huagang LNG Terminal, also known as 温州华港LNG接收站 and 温州华港LNG储运调峰中心, is an operating LNG import terminal in China.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Wenzhou Huagang LNG Terminal | Zhuangyuan'ao, Wenzhou, Zhejiang, China[1] | 27.903136, 121.127993 (exact) |
The map below shows the exact location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Wenzhou Huagang LNG Terminal | import[2] | operating[3] | 3 mtpa[1] | 3.0 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Wenzhou Huagang LNG Terminal | import[2] | US$448,000,000 (2,800,000,000 RMB)[4] | US$448,000,000 |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Wenzhou Huagang LNG Terminal | import[2] | operating[3] | – | – | 2020[4] | 2025[4][4][3] | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Wenzhou Huagang LNG Terminal | import[2] | operating[3] | Wenzhou Huagang Petrochemical Port Co [100%][5] | Huafeng Group Co Ltd [100.0%] | – |
Background
Wenzhou Huagang LNG Terminal is a proposed LNG terminal in Zheijang, China. [6]
Huanfeng Group was planning to invest 10.6 billion yuan ($1.619 million) to develop the LNG terminal in Wenzhou in 3 phases. [7]The first phase of the project, with an investment of about 2.8 billion yuan ($427.55 million), began construction in September 2020. The construction includes a 100,000-ton wharf, two 160,000 cubic meters of LNG storage tanks. The capacity of the terminal will reach 3 mtpa. It's expected to complete in 2023. [8]
China Huanqiu Contracting & Engineering Co., Ltd. (中国寰球工程有限公司) is the EPC contractor of the project.[9]
Construction started in November 2020.[10]
The EIA report of Wenzhou Huagang LNG jetty was open for public review in August 2022.[11]
By January 2024, the construction is still ongoing.[12]
In December 2024, the construction of storage tanks was completed[13]. In March 2025, the construction of LNG jetty was completed.[14] The LNG terminal began operational[15].
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.sohu.com/a/420955260_100273878.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://www.zj.msa.gov.cn/WZ/ggfw/ywdt/hxtg/202401/t20240116_743653.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://www.cnsphoto.com/newDetail/single/13339982?pictureId=41376502.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://www.huafeng.com/xwmt/hfxw47/274613.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.qcc.com/firm/318e6f673ee68b3e028537c023195773.html.
{{cite web}}: Missing or empty|title=(help) - ↑ "建设项目环境影响报告表--温州华港液化天然气(LNG)储运调峰(罐区)项目" (PDF). 2020-09-01.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华港液化天然气储运调峰中心项目举行开工仪式-华峰杂志". www.huafeng.com. Retrieved 2021-04-12.
- ↑ "温州华港LNG储运调峰中心一期项目举行开工仪式". www.sohu.com. 2020-09-26. Retrieved 2021-04-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "重磅 l 寰球公司签署温州华港LNG项目总承包合同!". www.sohu.com. 2019-09-12. Retrieved 2021-04-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "温州华港液化天然气(LNG)储运调峰中心(罐区)项目成功实现首个重大工程节点 - 华峰新闻 - 华峰集团有限公司". www.huafeng.com. Retrieved 2021-04-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "关于温州华港液化天然气(LNG)储运调峰中心项目码头工程环境影响报告书的公示". www.zjzhonglan.com. 2022-08-22.
{{cite web}}: CS1 maint: url-status (link) - ↑ "温州华港液化天然气(LNG)储运调峰中心项目码头工程施工作业变更船舶--温航通[2024]0009号". www.zj.msa.gov.cn. 2024-01-16.
{{cite web}}: CS1 maint: url-status (link) - ↑ "温州华港LNG接收站(罐区)试生产圆满成功 - 华峰新闻 - 华峰集团有限公司-打造国际一流的新材料合作伙伴". www.huafeng.com. 2024-12-02. Retrieved 2025-05-26.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙江温州:华港液化天然气(LNG)项目建成". www.asianewsphoto.com. 2025-03-25. Retrieved 2025-05-26.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙江温州:华港液化天然气(LNG)项目建成". www.cnsphoto.com. 2025-03-22. Retrieved 2025-05-26.
{{cite web}}: CS1 maint: url-status (link)