West Guangdong LNG Terminal

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

West Guangdong LNG Terminal (粤西LNG接收站), also known as Yuexi LNG Terminal, is a proposed LNG terminal in Guangdong, China.

Location

Loading map...

Project Details

  • Owner: PetroChina, GCL-Poly group, Maoming Port Group.
  • Location: Bohe New Port, Maoming, Guangdong, China
  • Coordinates: 21.409594, 111.28753 (exact)
  • Capacity:
  • Proposed Capacity: 3 mtpa, 0.43 bcfd
  • Status: Proposed
  • Type: Import
  • Start Year:

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

West Guangdong LNG Terminal was a proposed 3 mtpa LNG import terminal in Guangdong, China. A preliminary work plan by CNOOC was agreed to in 2014, and operation was planned for 2017. [1]

In 2018 the project was reported to be suspended.[2]

In February 2019 a feasibility study to build the terminal was prepared by GCL-Poly and China International Engineering Consulting Co.[3]

In October 2019 PetroChina and Maoming Municipal Government signed an agreement to build the LNG terminal with an estimated completion date of 2023.[4]

In June 2020, PetroChina, Maoming Municipal Government, GCL-Poly group and Maoming Port Group jointly signed a framework agreement for investment cooperation in the West Guangdong LNG Terminal.[5]

The land reclamation for LNG terminal completed in 2020.[6]

Articles and resources

References

  1. 粤西首个LNG项目获准开展前期工作, Paper.people.com.cn, 14 July 2014
  2. "中国最全的LNG接收站进度表,没有之一," Sohu, 2018-01-08
  3. "协鑫粤西LNG接收站项目可研报告通过专家评审(附协鑫油气板块概况)". www.sohu.com. 2019-03-09. Retrieved 2021-04-09.
  4. 中石油茂名LNG接收站计划2020年底动工, china-gas.org, Oct. 28, 2019
  5. 粤西LNG接收站进程更进一步 Source: 卓创资讯能源观察, 06-12-2020
  6. 粤西LNG造陆项目顺利合拢 Source: Maoming Net, 07-22-2020

Related GEM.wiki articles

External resources

External articles