Westland solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Solar Blue (Phase Blue), Westland Pomegranate (Phase Aquamarine)
Westland solar farm is an operating solar photovoltaic (PV) farm in Lemoore, Kings County, California, United States.
Project Details
Table 1: Phase-level project details for Westland solar farm
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|---|
| Aquamarine | Operating[1] | 2021[2] | 250 MWac[2] | PV[2] | CIM Group [100%][3] | CIM Group[3] |
| Blue | Operating[2] | 2023[2] | 250 MWac[2] | PV[2] | CIM Group; Westland Holdings Inc[4] | Westland Holdings[2] |
| Cherry | Pre-construction[2] | 2026 (planned)[2] | 250 MWac[2] | PV[2] | CIM Group; Westland Holdings Inc[4] | Westland Holdings[2] |
| Chestnut | Operating[2] | 2023[2] | 151 MWac[2] | PV[2] | CIM Group; Westland Holdings Inc[4] | Westland Holdings[2] |
| Grape | Pre-construction[2] | – | 246 MWac[2] | PV[2] | CIM Group; Westland Holdings Inc[4] | Westland Holdings[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Westland solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Aquamarine | Lemoore, Kings County, California, United States[2] | 36.1897, -119.9042 (exact)[2] |
| Blue | Lemoore, Kings County, California, United States[5] | 36.1740, -119.9043 (exact)[5] |
| Cherry | Lemoore, Kings County, California, United States[2] | 36.1225, -119.9232 (approximate)[2] |
| Chestnut | Lemoore, Kings County, California, United States[2] | 36.1602, -119.9049 (exact)[2] |
| Grape | Lemoore, Kings County, California, United States[2] | 36.1457, -119.9051 (exact)[2] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240206145720/https://pv-magazine-usa.com/2021/09/30/aquamarine-solar-project-enters-service-with-first-125-mw-of-capacity/. Archived from the original on 2024-02-06.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 3.0 3.1 https://web.archive.org/web/20240206181654/https://www.businesswire.com/news/home/20210930005255/en/CIM-Group-Announces-Completion-and-Commercial-Operation-of-First-125-Megawatt-Phase-of-Aquamarine-Solar-Photovoltaic-Project-at-Westlands-Solar-Park. Archived from the original on 2024-02-06.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://www.power-technology.com/projects/westlands-solar-park/ https://www.power-technology.com/projects/westlands-solar-park/, https://www.power-technology.com/projects/westlands-solar-park/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 5.0 5.1 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}: Check date values in:|access-date=(help)
