Wheatridge Renewable Wind Energy Center
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Wheatridge Renewable Wind Energy Center is an operating wind farm in Morrow County, Oregon, United States.
Project Details
Table 1: Phase-level project details for Wheatridge Renewable Wind Energy Center
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2020[2] | 300 MW[2] | Onshore[2] | NextEra Energy Inc; Portland General Electric Co[3] | NextEra Energy[4] |
Location
Table 2: Phase-level location details for Wheatridge Renewable Wind Energy Center
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Morrow County, Oregon, United States[2] | 45.4905, -119.5310 (exact)[2] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ https://www.windpowerengineering.com/300-mw-wind-farm-section-of-wheatridge-renewable-energy-facility-completed/ https://www.windpowerengineering.com/300-mw-wind-farm-section-of-wheatridge-renewable-energy-facility-completed/, https://www.windpowerengineering.com/300-mw-wind-farm-section-of-wheatridge-renewable-energy-facility-completed/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131033219/https://www.windpowerengineering.com/300-mw-wind-farm-section-of-wheatridge-renewable-energy-facility-completed/. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)