Wiggin Hill (Octopus Investments) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Wiggin Hill Solar Farm - Phase 1 (Phase 1), Wiggin Hill Solar Farm - Phase 2 (Phase 2)
Wiggin Hill (Octopus Investments) solar farm is an operating solar photovoltaic (PV) farm in Cambridgeshire, Eastern, England, United Kingdom.
Project Details
Table 1: Phase-level project details for Wiggin Hill (Octopus Investments) solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2015[1] | 7 MW[1] | PV[1] | Octopus Investments Ltd [100%][2] |
2 | Operating[1] | 2015[1] | 4 MW[1] | PV[1] | Octopus Investments Ltd [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Wiggin Hill (Octopus Investments) solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Cambridgeshire, Eastern, England, United Kingdom[1] | 52.3557, -0.0774 (exact)[1] |
2 | Cambridgeshire, Eastern, England, United Kingdom[1] | 52.3560, -0.0785 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
{{cite web}}
: Check date values in:|date=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240207072435/https://quoteddata.com/2020/03/octopus-renewables-completes-uk-solar-deal-for-an-initial-144-3m/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help)