Wildorado wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Wildorado wind farm is an operating wind farm in Oldham County, Texas, United States.

Project Details

Table 1: Phase-level project details for Wildorado wind farm

Phase name Status Commissioning year Retired year Nameplate capacity Type Owner Operator
1 Retired[1] 2007[1] 2020[2] 161 MW[3] Onshore[3] Clearway Energy Group LLC [100%][4] Clearway Energy Group[4]
RP1 Operating[1] 2020[2] 161 MW[3] Onshore[3] Clearway Energy Group LLC [100%][4] Clearway Energy Group[4]

Location

Table 2: Phase-level location details for Wildorado wind farm

Phase Name Location Coordinates (WGS 84)
1 Oldham County, Texas, United States[3] 35.2943, -102.3090 (exact)[3]
RP1 Oldham County, Texas, United States[3] 35.2943, -102.3090 (exact)[3]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240126160836/https://www.nsenergybusiness.com/news/clearway-energy-repowering-wildorado/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.{{cite web}}: CS1 maint: multiple names: authors list (link)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240125000034/http://investor.clearwayenergy.com/operations. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)