Willow Spring Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Willow Spring Solar is an operating solar photovoltaic (PV) farm in Los Angeles County, California, United States.
Project Details
Table 1: Phase-level project details for Willow Spring Solar
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
2 | Operating[1] | 2019[1] | 108 MWac[1] | PV[1] | DE Shaw Renewable Investments (DESRI) [100%][2] | DE Shaw Renewable Investments (DESRI)[1] |
3 | Operating[3] | 2023[3] | 72 MWac[3] | PV[1] | Leeward Energy [100%][4] | Leeward Energy[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Willow Spring Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
2 | Los Angeles County, California, United States[1] | 34.8267, -118.3352 (exact)[1] |
3 | Rosamond, Kern County, California, United States[1] | 34.8455, -118.3178 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://web.archive.org/web/20240206205108/https://www.globenewswire.com/news-release/2018/10/17/1622585/0/en/D-E-Shaw-Renewable-Investments-Acquires-Willow-Springs-Project-from-First-Solar.html. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240206181754/https://www.businesswire.com/news/home/20211019005592/en/Leeward-Renewable-Energy-Valley-Clean-Energy-Sign-15-year-Solar-Plus-Storage%C2%A0Power-Purchase-Agreement-for-Willow-Springs-3-Solar-Facility. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)