Wo Neng Offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Woneng 2 Offshore wind farm, Woneng 1 Offshore wind farm

Wo Neng Offshore wind farm (沃能二, 沃能二號離岸風力發電計畫, 沃能一, 沃能一號離岸風力發電計畫) is an announced wind farm in Taichung County, Taiwan.

Project Details

Table 1: Phase-level project details for Wo Neng Offshore wind farm

Phase name Status Nameplate capacity Type Owner
1 Announced[1] 2400 MW[2][3] Offshore hard mount[2] Ørsted A/S (沃旭能源)[4]
2 Announced[1] 600 MW[2][3] Offshore hard mount[2] Ørsted A/S (沃旭能源)[4]

Location

Table 2: Phase-level location details for Wo Neng Offshore wind farm

Phase Name Location Coordinates (WGS 84)
1 Taichung County, Taiwan[4] 24.5965, 120.2214 (approximate)[4][5]
2 Taichung County, Taiwan[4] 24.5965, 120.2214 (approximate)[4][5]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.ctee.com.tw/news/20221001700184-430104. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://www.windtaiwan.com/ArticleView.aspx?ID=ART00423. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.windtaiwan.com/ArticleView.aspx?ID=ART00855. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://www.bloomberg.com/press-releases/2022-04-21/taiwan-s-biggest-offshore-wind-farm-generates-first-power. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://windtaiwan.com/ArticleView.aspx?ID=ART00649. {{cite web}}: Missing or empty |title= (help)