Xieqiao power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Xieqiao power station (淮河能源集团谢桥电厂) is an operating power station of at least 1320-megawatts (MW) in Xieqiao, Yingshang, Fuyang, Anhui, China. It is also known as 阜阳谢桥电厂.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Xieqiao power station | Xieqiao, Yingshang, Fuyang, Anhui, China | 32.780686, 116.396706 (exact)[1] |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 32.780686, 116.396706
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Operating[2][3] | coal: unknown[4][5] | 660[3] | ultra-supercritical[5] | 2025[2][5] | False |
| Unit 2 | Operating[3][6] | coal: unknown[4][5] | 660[5] | ultra-supercritical[3] | 2026[6] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Huaihe Energy Power Group Co Ltd [100%][7] | Huaihe Energy Holding Group Co Ltd [74.0%]; China Development Bank Corp [10.7%]; unknown [7.8%]; China Cinda Asset Management Co Ltd [7.4%] |
| Unit 2 | Huaihe Energy Power Group Co Ltd [100%][7] | Huaihe Energy Holding Group Co Ltd [74.0%]; China Development Bank Corp [10.7%]; unknown [7.8%]; China Cinda Asset Management Co Ltd [7.4%] |
Project-level captive use details
- Captive industry: Coal Mining & Coal Products[1]
Project-level coal details
- Coal source(s): domestic
- Permit(s): 皖发改能源〔2022〕670号[7]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The 2 × 660 MW ultra-supercritical units were one of the major projects proposed by Huaihe Energy Group to allegedly promote the integration of coal production and electricity generation.[8]
Permission to build the plant was granted on December 7, 2022, by the Anhui Provincial Development and Reform Commission (皖发改能源〔2022〕670号).[9]
On June 20, 2023, the Environmental Impact Assessment was approved.[10]
Construction of Unit 1 began in late 2023 with the first concrete pour and boiler steel hoisting.[11][12]
In 2024 and 2025, it progressed through major milestones, including boiler and cooling tower construction, and grid connection in September 2025.[13][14] It passed its 168-hour trial run in September 2025.[15]
Construction of Unit 2 progressed in 2023 and 2024, with the first boiler steel hoisting completed.[16]
It achieved grid connection in November 2025 and passed its 168-hour trial run in January 2026.[17][18]
Articles and Resources
References
- ↑ 1.0 1.1 https://finance.sina.cn/2025-09-05/detail-infpmkhm0900312.d.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://news.bjx.com.cn/html/20250923/1462375.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 "安徽2×660MW超超临界燃煤机组正式开工". Weixin Official Accounts Platform. Archived from the original on 2024-01-25. Retrieved 2023-10-09.
- ↑ 4.0 4.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 5.4 "谢桥电厂2×660兆瓦超超临界燃煤机组发电项目正在加紧建设". Weixin Official Accounts Platform. Archived from the original on 2024-01-25. Retrieved 2023-10-10.
- ↑ 6.0 6.1 https://news.bjx.com.cn/html/20260202/1482372.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 7.2 http://jx.ah.gov.cn/site/tpl/1034671121?id=23491.
{{cite web}}: Missing or empty|title=(help) - ↑ "2×660MW!谢桥电厂项目可研报告通过专家审查". BJX. 2022-10-18. Retrieved 2023-02-03.
- ↑ "安徽省发展改革委关于阜阳谢桥电厂项目核准的批复". 安徽省经济和信息化厅. 2022-12-22. Retrieved 2023-02-03.
{{cite web}}: CS1 maint: url-status (link) - ↑ "淮河能源控股集团谢桥电厂2×660MW超超临界燃煤机组发电项目环境影响报告书审批意见的函," BJX, 2023-06-25
- ↑ "1号锅炉房第一罐混凝土顺利浇筑". WeChat. 2023-09-25. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "淮河能源谢桥电厂2×660MW超超临界燃煤机组发电项目#1锅炉钢架顺利开吊". WeChat. 2023-12-16. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "淮河能源谢桥电厂2×660兆瓦燃煤发电项目循环水泵房出零米". WeChat. 2024-04-12. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "谢桥电厂2×660MW超超临界燃煤机组发电项目1号机组并网". BeiJiXing (BJX) News. 2025-09-03. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "淮河能源谢桥电厂2×660兆瓦超超临界燃煤机组工程1号机组完成168小时满负荷试运行". BeiJiXing (BJX) News. 2025-09-23. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "谢桥电厂2×660兆瓦超超临界燃煤机组发电项目2号锅炉首根钢架顺利就位". BeiJiXing (BJX) News. 2024-01-24. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "谢桥电厂项目2号机组首次并网一次成功". WeChat. 2025-11-28. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "谢桥电厂2×660兆瓦超超临界燃煤机组发电项目2号机组圆满完成168小时满负荷试运行". WeChat. 2026-01-29. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.