Xieqiao power station (淮河能源集团谢桥电厂) is an operating power station of at least 1320-megawatts (MW) in Xieqiao, Yingshang, Fuyang, Anhui, China. It is also known as 阜阳谢桥电厂.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Xieqiao power station Xieqiao, Yingshang, Fuyang, Anhui, China 32.780686, 116.396706 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 32.780686, 116.396706

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Operating[2][3] coal: unknown[4][5] 660[3] ultra-supercritical[5] 2025[2][5] False
Unit 2 Operating[3][6] coal: unknown[4][5] 660[5] ultra-supercritical[3] 2026[6] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Huaihe Energy Power Group Co Ltd [100%][7] Huaihe Energy Holding Group Co Ltd [74.0%]; China Development Bank Corp [10.7%]; unknown [7.8%]; China Cinda Asset Management Co Ltd [7.4%]
Unit 2 Huaihe Energy Power Group Co Ltd [100%][7] Huaihe Energy Holding Group Co Ltd [74.0%]; China Development Bank Corp [10.7%]; unknown [7.8%]; China Cinda Asset Management Co Ltd [7.4%]

Project-level captive use details

  • Captive industry: Coal Mining & Coal Products[1]


Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 皖发改能源〔2022〕670号[7]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The 2 × 660 MW ultra-supercritical units were one of the major projects proposed by Huaihe Energy Group to allegedly promote the integration of coal production and electricity generation.[8]

Permission to build the plant was granted on December 7, 2022, by the Anhui Provincial Development and Reform Commission (皖发改能源〔2022〕670号).[9]

On June 20, 2023, the Environmental Impact Assessment was approved.[10]

Construction of Unit 1 began in late 2023 with the first concrete pour and boiler steel hoisting.[11][12]

In 2024 and 2025, it progressed through major milestones, including boiler and cooling tower construction, and grid connection in September 2025.[13][14] It passed its 168-hour trial run in September 2025.[15]

Construction of Unit 2 progressed in 2023 and 2024, with the first boiler steel hoisting completed.[16]

It achieved grid connection in November 2025 and passed its 168-hour trial run in January 2026.[17][18]

Articles and Resources

References

  1. ↑ 1.0 1.1 https://finance.sina.cn/2025-09-05/detail-infpmkhm0900312.d.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://news.bjx.com.cn/html/20250923/1462375.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 "安徽2×660MW超超临界燃煤机组正式开工". Weixin Official Accounts Platform. Archived from the original on 2024-01-25. Retrieved 2023-10-09.
  4. ↑ 4.0 4.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 5.4 "谢桥电厂2×660兆瓦超超临界燃煤机组发电项目正在加紧建设". Weixin Official Accounts Platform. Archived from the original on 2024-01-25. Retrieved 2023-10-10.
  6. ↑ 6.0 6.1 https://news.bjx.com.cn/html/20260202/1482372.shtml. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 7.2 http://jx.ah.gov.cn/site/tpl/1034671121?id=23491. {{cite web}}: Missing or empty |title= (help)
  8. ↑ "2×660MW!谢桥电厂项目可研报告通过专家审查". BJX. 2022-10-18. Retrieved 2023-02-03.
  9. ↑ "安徽省发展改革委关于阜阳谢桥电厂项目核准的批复". 安徽省经济和信息化厅. 2022-12-22. Retrieved 2023-02-03.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "淮河能源控股集团谢桥电厂2×660MW超超临界燃煤机组发电项目环境影响报告书审批意见的函," BJX, 2023-06-25
  11. ↑ "1号锅炉房第一罐混凝土顺利浇筑". WeChat. 2023-09-25. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "淮河能源谢桥电厂2×660MW超超临界燃煤机组发电项目#1锅炉钢架顺利开吊". WeChat. 2023-12-16. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "淮河能源谢桥电厂2×660兆瓦燃煤发电项目循环水泵房出零米". WeChat. 2024-04-12. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "谢桥电厂2×660MW超超临界燃煤机组发电项目1号机组并网". BeiJiXing (BJX) News. 2025-09-03. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "淮河能源谢桥电厂2×660兆瓦超超临界燃煤机组工程1号机组完成168小时满负荷试运行". BeiJiXing (BJX) News. 2025-09-23. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "谢桥电厂2×660兆瓦超超临界燃煤机组发电项目2号锅炉首根钢架顺利就位". BeiJiXing (BJX) News. 2024-01-24. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "谢桥电厂项目2号机组首次并网一次成功". WeChat. 2025-11-28. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "谢桥电厂2×660兆瓦超超临界燃煤机组发电项目2号机组圆满完成168小时满负荷试运行". WeChat. 2026-01-29. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.